1. connector change 2. IP Setup
Similar Posts
DTW -118 Radio Communication checking complete.
Posted on
Observation: DTW 118 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 118, We checked up to 10 minutes. RSSI…
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check.
Posted on
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
IRP-2 Server Rack Installation and Optical Fiber Rejoin
Posted on
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
DTW- 107 Radio Communication checking complete.
Posted on
Observation: DTW 107 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 107, We checked up to 10 minutes. In…