IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
Chlorine cylinder lode shell checking and maintenance.
Posted on
Problem found: lode shell connection terminal circuit problem found.
OGR Booster pump (E) checking complete.
Posted on
Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E). In this case the valve…