New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.
Similar Posts
DTW-223 5Nos CCTV Maintenance
Posted on
ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4
IRP-2 Server Rak Installation
Posted on
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez
PIT maintenance work report (IRP-2)
Posted on
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist
ACTIVITY | DAILY REPORTS | Jewel | REPORTS
IRP-1 All LOP Panel Cleaning
Posted on
IRP-1 All LOP Panel Cleaning Done
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
Chlorine cylinder lode shell checking and maintenance.
Posted on
Problem found: lode shell connection terminal circuit problem found.
IRP-1 DTW RTU,VFD & CCTV Panel Cleaning
Posted on
Dtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .