

After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is very bad.












After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is very bad.
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
To solve this problem, we increase the height 1 meter more and change the direction.
IRP-1. CC Camera Server Panel Cleaning Done
In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…