Similar Posts
  - DTW-217 and 103 VFD controller Drive Installation DonePosted on- 1.VFD Controller Installation 2.Modbus Serial Communication Cable Check 
  - Instrumentation of Month (September,2022)Posted on- Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,… 
  - DTW-104,105,106,107 CLEANING WORKPosted on- DTW-104,105,106,107 Cleaning Done 
  - CCTV Maintenance At DTW-120Posted on- Connector change IP Setting 
- IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check.Posted on- IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed. 