IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check.
Posted on
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.

Fiber Optical Maintenance
Posted on
Fiber Optical Maintenance Near DTW-103

ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
OGR booster pump D winding temperature & Bearing temperature sensor checking.
Posted on
Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….