IRP-2 Sub-Station 1Nos New Server Rack Installation Done
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
Float switch reconnection and rearrange. Now normal
The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…