ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez Chlorine cylinder lode shell checking and maintenance. Posted onSeptember 17, 2022September 17, 2022 Problem found: lode shell connection terminal circuit problem found.
ACTIVITY | Parvez PWID106: IRP-1 All FCP & LOP panel clean. Posted onNovember 21, 2023November 21, 2023
ACTIVITY PWID27:DTW204 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY PWID33:DTW210 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue OGR Booster pump E checking & maintenance. Posted onSeptember 22, 2022October 12, 2022 Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…
ACTIVITY PWID46:DTW101 to 106 TJ Box sealing with silicon glue. Posted onNovember 16, 2023November 16, 2023