ACTIVITY | CCTV | DAILY REPORTS | DTW
DTW-106 CC Camera Establishment
Posted on
1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity
IRP-2 Server Rack Installation and Optical Fiber Rejoin
Posted on
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
IRP-1 SDB Additional Dewatering Pump Fault check
Posted on
IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue
OGR Booster pump E checking & maintenance.
Posted on
Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…