IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust
Due To Strom the optical fiber cable fall down and damage near DTW-121 to 122 now everything is normal
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
PIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…