ACTIVITY PWID3:DTW103 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | CCTV CCTV Maintenance At DTW- 202 Posted onOctober 19, 2022December 11, 2022 1.Cable connector change 2. IP Setup
ACTIVITY | CCTV | DAILY REPORTS | Jewel | Pappu | Parvez IRP-1 360° DOME CAMERA DISPLAY, SPLITTER, HDMI CABLE INSPECTION & MAINTENANCE. Posted onSeptember 27, 2022September 27, 2022
ACTIVITY PWID43:DTW221 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | Jewel | Pappu | Parvez Material inspection of SCADA Panel room Wall Mounted display. Posted onSeptember 12, 2022September 13, 2022
ACTIVITY | DTW | Parvez Level Sensor Report 2022 Posted onAugust 30, 2022November 14, 2022 Level Sensor Report October 2022 SL NO. DTW NO. STATIC LEVEL PUMPING LEVEL Type STATUS 01 101 5.8 ❎Level Sensor problem. 02…