Similar Posts
DTW-104,105,106,107 CLEANING WORK
Posted on
DTW-104,105,106,107 Cleaning Done
FIT-3001 Maintenance
Posted on
After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
Instrumentation Findings of Month (October,2022)
Posted on
Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
CCTV Maintenance At DTW-103
Posted on
CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting
DTW-107 Radio Communication Problem
Posted on
DTW-107 Radio Communication Problem Check
ACTIVITY | CCTV | DAILY REPORTS | DTW
DTW-114 CC Camera Install
Posted on
1.DTW-114 1Nos Camera Install Done 2.New UTP Cable Install 3.Connector Change Now DTW-114 5Nos Camera in Operation