ACTIVITY | CCTV CCTV Maintenance At DTW-206 Posted onOctober 19, 2022December 11, 2022 1.Cable connector change 2. IP Setup
ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS IRP-1 (101 to 123) & IRP-2 (201 to 223) I & C device checking complete. Posted onOctober 22, 2022October 22, 2022
ACTIVITY | DAILY REPORTS | Parvez | REPORTS OGR Booster room dewatering pump run command showing problem at low level Posted onDecember 6, 2022December 6, 2022 Float switch reconnection and rearrange. Now normal
ACTIVITY | CCTV | DTW CCTV Maintenance At DTW-222 Posted onOctober 22, 2022October 22, 2022 1.UTP Cable Change 2.Connector Change 3.IP Setup
ACTIVITY | CCTV | DAILY REPORTS | Parvez | REPORTS Office Building CCTV Install Posted onDecember 9, 2022December 9, 2022 IRP-1 Office Building 1 Nos New Camera Install For Security Purpose
ACTIVITY PWID26:DTW203 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023