ACTIVITY | DAILY REPORTS | DTW | Pappu
DTW – 111 LIT Maintenance Work Complete.
Posted on
Dtw 111 LIT Reinstallation complete . DTW 111 থেকে পুরাতন একটি LIT স্টোরে জমা দেয়া হয়েছে ৷
IRP-2 All FCP panel cleaning
Posted on
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
Posted on
Previous control cable is damaged by ant .so we replace new control cable
Fiber Optic Splice Protection Sleeve-Single Fiber
Posted on
Specification SL No Specification criteria Specifications 1 Length of Tube 60mm 2 Inner Tube Diameter Inner 1.5mmOuter 2.2mm 3 After Recover Diameter 3mm…
ACTIVITY | DAILY REPORTS | Parvez | REPORTS
OGR Booster room dewatering pump run command showing problem at low level
Posted on
Float switch reconnection and rearrange. Now normal