Similar Posts
Optical Fiber restoration work at DTW103
Posted on
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez
DTW-110 Pump inspection & ready to run up.
Posted on
Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…
IRP-1 All DTW NEV Voltage check
Posted on