Similar Posts
ACTIVITY | DAILY REPORTS | MOV | Pappu
OGR booster pump F MOV limit switch adjustment complete.
Posted on
Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the mov. In this case the valve is…
IRP-1/2 Optical Fiber Maintenance Report
Posted on
IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
OGR Booster pump (E) checking complete.
Posted on
Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E). In this case the valve…
FIT-3001 Maintenance
Posted on
After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…