To solve this problem, we increase the height 1 meter more and change the direction.
Similar Posts

ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
Chlorine cylinder lode shell checking and maintenance.
Posted on
Problem found: lode shell connection terminal circuit problem found.
DTW-113 LIT,PIT,FIT isolation due to regeneration
Posted on
Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…

DTW-Camera Lens Cleaning
Posted on
DTW-101,102,103,104,107,109,110,111,209,206,207,205,208,203,201 Camera Lens Cleaning Done There are too much dust accumulate on the camera lens and the video footage isn’t clear to understand.
ACTIVITY | DTW | Parvez | Uncategorized
WID585:Dtw-117 e-PRV CRD isn’t functioning properly. SEL manpower need to check.Now e-PRV CRD & flowmeter works
Posted on
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…