IRP-2 All Dome Camera Lens Cleaning
IRP-2 All Dome Camera Lens Cleaning Done
IRP-2 All Dome Camera Lens Cleaning Done
SCADA Room & Work Station CPU cleaning
Google Map Location Lat/Long: 23°44’21.0″N 90°24’29.3″E Date: 2022.12.20 Observation: Recommendation: Pictures: Date: 2022.12.22 Date: 2022.12.24 Date: 2022.12.26
What is Dual Power Source Dual power source means double power source to operate any electrical system. Necessity of Dual Power Source at…
Still Fiber Loss
Fiber Join and cable arrangement Now DTW-115,117,118,119 CCTV Operation in NAV-2
DTW-102 Radio Antena Setting Done now radio signal normal and stable, DTW is remotely operatable
DTW-101,102,103,104,107,109,110,111,209,206,207,205,208,203,201 Camera Lens Cleaning Done There are too much dust accumulate on the camera lens and the video footage isn’t clear to understand.
DTW-120 CCTV Maintenance There was connector Problem. Now DTW-120 (5 nos ) camera operation in NAV-2
There was so much dust