Breaker installation for SCADA control Room Monitor Done





Breaker installation for SCADA control Room Monitor Done





IRP-1. CC Camera Server Panel Cleaning Done
Table of Contents DTW SCADA PANEL ROOM OGR ELECTRICAL PANEL ROOM SAND FILTER ELECTRICAL PANEL ROOM DOME CAMERA PANEL DTW SL NO Item…
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.