  • PIT Maintenance Work Report (IRP-1)
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

    PIT Maintenance Work Report (IRP-1)

    Posted onNovember 9, 2022November 9, 2022

    DTW-114 PIT ok. DTW-113 PIT ok but scadapack AO port damaged. DTW-104 PIT doesn’t exist. DTW-105 PIT ok (regeneration on going)

    Listen to the Message PIT Maintenance Work Report (IRP-1)Continue

  • DTW-107 Radio Communication Check and Maintenance
    ACTIVITY | DAILY REPORTS | DTW | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

    DTW-107 Radio Communication Check and Maintenance

    Posted onNovember 8, 2022November 8, 2022

    Radio Communication problem solve and there are graphical problem in SCADA DTW 107 radio comm. checking complete.গত ৩১/১০/২০২২ তারিখ বিকাল 06:18 pm এর…

    Listen to the Message DTW-107 Radio Communication Check and MaintenanceContinue

  • PIT maintenance work report (IRP-2)
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

    PIT maintenance work report (IRP-2)

    Posted onNovember 8, 2022November 8, 2022

    PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist

    Listen to the Message PIT maintenance work report (IRP-2)Continue

  • DTW-106 CC Camera Establishment
    ACTIVITY | CCTV | DAILY REPORTS | DTW

    DTW-106 CC Camera Establishment

    Posted onNovember 7, 2022December 26, 2022

    1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity

    Listen to the Message DTW-106 CC Camera EstablishmentContinue

  • DTW-114 CC Camera Install
    ACTIVITY | CCTV | DAILY REPORTS | DTW

    DTW-114 CC Camera Install

    Posted onNovember 6, 2022November 6, 2022

    1.DTW-114 1Nos Camera Install Done 2.New UTP Cable Install 3.Connector Change Now DTW-114 5Nos Camera in Operation

    Listen to the Message DTW-114 CC Camera InstallContinue

  • DTW-113 Scada Pack Install
    ACTIVITY | DAILY REPORTS | DTW

    DTW-113 Scada Pack Install

    Posted onNovember 6, 2022November 6, 2022

    DTW-113 Scada Pack Programing And Install Done

    Listen to the Message DTW-113 Scada Pack InstallContinue

  • DTW-102 Scada Pack Install
    ACTIVITY | DAILY REPORTS | DTW

    DTW-102 Scada Pack Install

    Posted onNovember 6, 2022November 6, 2022

    DTW-102 Scada Pack Programing And Install Done

    Listen to the Message DTW-102 Scada Pack InstallContinue

  • DTW-211 Serial Communication Cable check and Rejoin
    ACTIVITY | DTW | Parvez

    DTW-211 Serial Communication Cable check and Rejoin

    Posted onNovember 5, 2022November 5, 2022

    DTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal

    Listen to the Message DTW-211 Serial Communication Cable check and RejoinContinue

  • DTW-217 and 103 VFD controller Drive Installation Done
    ACTIVITY | DTW | Parvez

    DTW-217 and 103 VFD controller Drive Installation Done

    Posted onNovember 5, 2022November 5, 2022

    1.VFD Controller Installation 2.Modbus Serial Communication Cable Check

    Listen to the Message DTW-217 and 103 VFD controller Drive Installation DoneContinue

  • DTW- 106 CCTV Pool And UTP Cable Installation
    ACTIVITY | CCTV | DTW | Pappu

    DTW- 106 CCTV Pool And UTP Cable Installation

    Posted onNovember 5, 2022November 5, 2022

    1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation

    Listen to the Message DTW- 106 CCTV Pool And UTP Cable InstallationContinue

Page navigation

Previous PagePrevious 1 … 11 12 13 14 15 … 26 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers