  • CCTV Maintenance At DTW-101
    ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS

    CCTV Maintenance At DTW-101

    Posted onOctober 23, 2022December 11, 2022

    1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup

    Listen to the Message CCTV Maintenance At DTW-101Continue

  • CCTV Maintenance At DTW-102
    ACTIVITY | CCTV | DTW | Uncategorized

    CCTV Maintenance At DTW-102

    Posted onOctober 23, 2022October 23, 2022

    1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang

    Listen to the Message CCTV Maintenance At DTW-102Continue

  • Fiber Optical Maintenance
    ACTIVITY | CCTV | OFFICIAL NOTE | Uncategorized

    Fiber Optical Maintenance

    Posted onOctober 23, 2022October 23, 2022

    Fiber Optical Maintenance Near DTW-103

    Listen to the Message Fiber Optical MaintenanceContinue

  • EPRV Work DTW-117 By ICE Team & SEL
    ACTIVITY | DTW | DTW103

    EPRV Work DTW-117 By ICE Team & SEL

    Posted onOctober 22, 2022October 22, 2022

    DTW-117

    Listen to the Message EPRV Work DTW-117 By ICE Team & SELContinue

  • DTW-115 LIT Installing
    ACTIVITY | DTW

    DTW-115 LIT Installing

    Posted onOctober 22, 2022October 23, 2022

    Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU

    Listen to the Message DTW-115 LIT InstallingContinue

  • CCTV Maintenance At DTW-222
    ACTIVITY | CCTV | DTW

    CCTV Maintenance At DTW-222

    Posted onOctober 22, 2022October 22, 2022

    1.UTP Cable Change 2.Connector Change 3.IP Setup

    Listen to the Message CCTV Maintenance At DTW-222Continue

  • DTW-223 CCTV Establishment
    ACTIVITY | CCTV | DTW

    DTW-223 CCTV Establishment

    Posted onOctober 22, 2022October 22, 2022

    Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,

    Listen to the Message DTW-223 CCTV EstablishmentContinue

  • EPRV work with DTW 103 by ICE Team & SEL
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    EPRV work with DTW 103 by ICE Team & SEL

    Posted onOctober 22, 2022October 22, 2022

    Listen to the Message EPRV work with DTW 103 by ICE Team & SELContinue

  • IRP-1 (101 to 123) & IRP-2 (201 to 223)  I & C device checking complete.
    ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

    IRP-1 (101 to 123) & IRP-2 (201 to 223) I & C device checking complete.

    Posted onOctober 22, 2022October 22, 2022

    Listen to the Message IRP-1 (101 to 123) & IRP-2 (201 to 223) I & C device checking complete.Continue

  • CCTV Maintenance At DTW-119
    ACTIVITY | CCTV

    CCTV Maintenance At DTW-119

    Posted onOctober 19, 2022December 11, 2022

    1.1 Nos New Camera Installation . 2. connector change 3. IP Setup

    Listen to the Message CCTV Maintenance At DTW-119Continue

Page navigation

Previous PagePrevious 1 … 14 15 16 17 18 … 26 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers