    Equipment’s List for SKWP[Location Wise]

    Posted onSeptember 22, 2022November 5, 2022

    Table of Contents DTW SCADA PANEL ROOM OGR ELECTRICAL PANEL ROOM SAND FILTER ELECTRICAL PANEL ROOM DOME CAMERA PANEL DTW SL NO Item…

    Listen to the Message Equipment’s List for SKWP[Location Wise]Continue

  • 4 nos Monitoring Well Level Sensor Installation Complete.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    4 nos Monitoring Well Level Sensor Installation Complete.

    Posted onSeptember 21, 2022September 21, 2022

    1 :MW03B 2: MW14A 3:MW08A 4: MW13B

    Listen to the Message 4 nos Monitoring Well Level Sensor Installation Complete.Continue

  • OGR booster pump D winding temperature & Bearing temperature sensor checking.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    OGR booster pump D winding temperature & Bearing temperature sensor checking.

    Posted onSeptember 18, 2022September 18, 2022

    Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….

    Listen to the Message OGR booster pump D winding temperature & Bearing temperature sensor checking.Continue

  • IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance
    ACTIVITY | DAILY REPORTS | Pappu | Parvez

    IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance

    Posted onSeptember 18, 2022September 18, 2022

    Problem: SCADA always showing HI signal. Problem found: 1 NOS float switch problem found. A good sensor in HIHI position is replaced with…

    Listen to the Message IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor MaintenanceContinue

  • DTW-110 Pump inspection & ready to run up.
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez

    DTW-110 Pump inspection & ready to run up.

    Posted onSeptember 18, 2022September 18, 2022

    Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…

    Listen to the Message DTW-110 Pump inspection & ready to run up.Continue

  • IRP#2 Sludge drying bed A float switch checking complete.
    ACTIVITY | DAILY REPORTS | Pappu

    IRP#2 Sludge drying bed A float switch checking complete.

    Posted onSeptember 17, 2022September 17, 2022

    Problem: SCADA always showing HI signal. Problem found: 1 Nos float switch problem. HI signal float switch problem & float switch connection terminal…

    Listen to the Message IRP#2 Sludge drying bed A float switch checking complete.Continue

  • Chlorine cylinder lode shell checking and maintenance.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    Chlorine cylinder lode shell checking and maintenance.

    Posted onSeptember 17, 2022September 17, 2022

    Problem found: lode shell connection terminal circuit problem found.

    Listen to the Message Chlorine cylinder lode shell checking and maintenance.Continue

  • IRP1 Sludge drying bed float switch checking.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Pending Issue

    IRP1 Sludge drying bed float switch checking.

    Posted onSeptember 15, 2022October 12, 2022

    Problem found: Sludge bed চেম্বারে কাদার পরিমান বেশি হওয়ার কারনে ৷ LoLo সিগনালের ফ্লোট সুইচটি কাদার মধ্যে অাটকে যাচ্ছে ৷তাই স্কাডাতে  HiHiLoLo সিগনাল…

    Listen to the Message IRP1 Sludge drying bed float switch checking.Continue

  • ACTIVITY

    PROSOSED SYSTEM FOR CONTRACTOR WORK ENVIRONMENT

    Posted onSeptember 14, 2022September 14, 2022

    Listen to the Message PROSOSED SYSTEM FOR CONTRACTOR WORK ENVIRONMENTContinue

  • IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.
    ACTIVITY | Jewel | Pappu | Parvez

    IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.

    Posted onSeptember 12, 2022September 12, 2022

    Listen to the Message IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.Continue

Page navigation

Previous PagePrevious 1 … 21 22 23 24 25 26 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers