  • Optical Fiber restoration work at DTW103
    ACTIVITY | CCTV | DTW103 | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

    Optical Fiber restoration work at DTW103

    Posted onSeptember 7, 2022September 24, 2022

    In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

    Listen to the Message Optical Fiber restoration work at DTW103Continue

  • OGR Booster pump (E) checking complete.
    ACTIVITY | DAILY REPORTS | Jewel | MOV | Pappu | Parvez

    OGR Booster pump (E) checking complete.

    Posted onSeptember 7, 2022September 7, 2022

    Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E).  In this case the valve…

    Listen to the Message OGR Booster pump (E) checking complete.Continue

  • OGR Booster Pump supply fan (4M02B) checking and findings.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    OGR Booster Pump supply fan (4M02B) checking and findings.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message OGR Booster Pump supply fan (4M02B) checking and findings.Continue

  • ACTIVITY | CCTV | DTW | Jewel

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .Continue

  • DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.
    ACTIVITY | DTW | MONTHLY REPORTS | Pappu

    DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.Continue

  • ACTIVITY | CCTV | DTW | Jewel | MONTHLY REPORTS

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .

    Posted onSeptember 5, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .Continue

  • ACTIVITY | DTW | MONTHLY REPORTS | Pappu

    DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.

    Posted onSeptember 5, 2022September 6, 2022

    Listen to the Message DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.Continue

  • Instrumentation of Month (September,2022)
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    Instrumentation of Month (September,2022)

    Posted onSeptember 4, 2022October 17, 2022

    Daily Work Plan September 2022đź — SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: âś…PAPPU,…

    Listen to the Message Instrumentation of Month (September,2022)Continue

  • IRP-1/2 Optical Fiber Maintenance Report
    ACTIVITY | CCTV | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

    IRP-1/2 Optical Fiber Maintenance Report

    Posted onAugust 30, 2022September 5, 2022

    IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No.  Location  Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…

    Listen to the Message IRP-1/2 Optical Fiber Maintenance ReportContinue

  • ACTIVITY | DTW | Parvez

    Level Sensor Report 2022

    Posted onAugust 30, 2022November 14, 2022

    Level Sensor Report October 2022 SL NO. DTW NO. STATIC LEVEL PUMPING LEVEL Type STATUS 01 101   5.8 ❎Level Sensor problem. 02…

    Listen to the Message Level Sensor Report 2022Continue

Page navigation

Previous PagePrevious 1 … 22 23 24 25 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers