    Material inspection of SCADA Panel room Wall Mounted display.

    Posted onSeptember 12, 2022September 13, 2022

    Listen to the Message Material inspection of SCADA Panel room Wall Mounted display.Continue

  • ACTIVITY | Jewel | Pappu | Parvez

    Material Inspection of IRP-1 & IRP-2 Radio communication establishment.

    Posted onSeptember 12, 2022September 13, 2022

    Listen to the Message Material Inspection of IRP-1 & IRP-2 Radio communication establishment.Continue

  • DTW-206 New POE Switch installing & CC Camera checking
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW-206 New POE Switch installing & CC Camera checking

    Posted onSeptember 12, 2022September 12, 2022

    Problem found: POE Switch & 4 NOS CC camera problem found.

    Listen to the Message DTW-206 New POE Switch installing & CC Camera checkingContinue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW 106 and 223 CCTV Camera Network Establishment Equipment List

    Posted onSeptember 11, 2022September 11, 2022

    Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…

    Listen to the Message DTW 106 and 223 CCTV Camera Network Establishment Equipment ListContinue

  • DTW- 206 RTU Panel Power System Checking & Problem Found.
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue

    DTW- 206 RTU Panel Power System Checking & Problem Found.

    Posted onSeptember 10, 2022October 12, 2022

    problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.

    Listen to the Message DTW- 206 RTU Panel Power System Checking & Problem Found.Continue

  • IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.

    Posted onSeptember 10, 2022September 10, 2022

    problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…

    Listen to the Message IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.Continue

  • DTW115 SCADA PACK INSTALL COMPLETE
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW115 SCADA PACK INSTALL COMPLETE

    Posted onSeptember 8, 2022September 9, 2022

    Listen to the Message DTW115 SCADA PACK INSTALL COMPLETEContinue

  • Optical Fiber restoration work at DTW103
    ACTIVITY | CCTV | DTW103 | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

    Optical Fiber restoration work at DTW103

    Posted onSeptember 7, 2022September 24, 2022

    In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

    Listen to the Message Optical Fiber restoration work at DTW103Continue

  • OGR Booster pump (E) checking complete.
    ACTIVITY | DAILY REPORTS | Jewel | MOV | Pappu | Parvez

    OGR Booster pump (E) checking complete.

    Posted onSeptember 7, 2022September 7, 2022

    Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E).  In this case the valve…

    Listen to the Message OGR Booster pump (E) checking complete.Continue

  • OGR Booster Pump supply fan (4M02B) checking and findings.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    OGR Booster Pump supply fan (4M02B) checking and findings.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message OGR Booster Pump supply fan (4M02B) checking and findings.Continue

Page navigation

Previous PagePrevious 1 … 22 23 24 25 26 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers