ACTIVITY | DTW | DTW103 | Parvez

DTW-103 VFD Controller Install

Posted onNovember 3, 2022November 3, 2022

1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done

Listen to the Message DTW-103 VFD Controller InstallContinue

CCTV Maintenance At DTW-103
ACTIVITY | CCTV | DTW | DTW103

CCTV Maintenance At DTW-103

Posted onOctober 27, 2022October 27, 2022

CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting

Listen to the Message CCTV Maintenance At DTW-103Continue

EPRV Work DTW-117 By ICE Team & SEL
ACTIVITY | DTW | DTW103

EPRV Work DTW-117 By ICE Team & SEL

Posted onOctober 22, 2022October 22, 2022

DTW-117

Listen to the Message EPRV Work DTW-117 By ICE Team & SELContinue

Optical Fiber restoration work at DTW103
ACTIVITY | CCTV | DTW103 | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

Optical Fiber restoration work at DTW103

Posted onSeptember 7, 2022September 24, 2022

In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

Listen to the Message Optical Fiber restoration work at DTW103Continue