    DTW 106 and 223 CCTV Camera Network Establishment Equipment List

    Posted onSeptember 11, 2022September 11, 2022

    Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…

    Listen to the Message DTW 106 and 223 CCTV Camera Network Establishment Equipment ListContinue

  • DTW- 206 RTU Panel Power System Checking & Problem Found.
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue

    DTW- 206 RTU Panel Power System Checking & Problem Found.

    Posted onSeptember 10, 2022October 12, 2022

    problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.

    Listen to the Message DTW- 206 RTU Panel Power System Checking & Problem Found.Continue

  • DTW115 SCADA PACK INSTALL COMPLETE
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW115 SCADA PACK INSTALL COMPLETE

    Posted onSeptember 8, 2022September 9, 2022

    Listen to the Message DTW115 SCADA PACK INSTALL COMPLETEContinue

  • Optical Fiber restoration work at DTW103
    ACTIVITY | CCTV | DTW103 | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

    Optical Fiber restoration work at DTW103

    Posted onSeptember 7, 2022September 24, 2022

    In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

    Listen to the Message Optical Fiber restoration work at DTW103Continue

  • ACTIVITY | CCTV | DTW | Jewel

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .Continue

  • DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.
    ACTIVITY | DTW | MONTHLY REPORTS | Pappu

    DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.

    Posted onSeptember 6, 2022September 6, 2022

    Listen to the Message DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.Continue

  • ACTIVITY | CCTV | DTW | Jewel | MONTHLY REPORTS

    CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .

    Posted onSeptember 5, 2022September 6, 2022

    Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .Continue

  • ACTIVITY | DTW | MONTHLY REPORTS | Pappu

    DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.

    Posted onSeptember 5, 2022September 6, 2022

    Listen to the Message DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.Continue

  • SCADA PACK REPORT IRP 1/2
    DTW | MONTHLY REPORTS

    SCADA PACK REPORT IRP 1/2

    Posted onSeptember 4, 2022September 5, 2022

    SI DTW STATUS COMMENT 1 101 OK 2 102 OK 3 103 OK 4 104 OK 5 105 OK 6 106 OK 7…

    Listen to the Message SCADA PACK REPORT IRP 1/2Continue

  • Instrumentation of Month (September,2022)
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    Instrumentation of Month (September,2022)

    Posted onSeptember 4, 2022October 17, 2022

    Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…

    Listen to the Message Instrumentation of Month (September,2022)Continue

Page navigation

Previous PagePrevious 1 … 10 11 12 13 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers