  • DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | REPORTS

    DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING

    Posted onNovember 29, 2022November 29, 2022

    DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING COMPLETE There was so much dust

    Listen to the Message DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANINGContinue

  • DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANING
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

    DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANING

    Posted onNovember 27, 2022November 27, 2022

    DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANING COMPLETE

    Listen to the Message DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANINGContinue

  • IRP-2 All FCP panel cleaning
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | REPORTS

    IRP-2 All FCP panel cleaning

    Posted onNovember 24, 2022November 26, 2022

    IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়

    Listen to the Message IRP-2 All FCP panel cleaningContinue

  • IRP-2 Sub-Station CC Camera Maintenance
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Parvez

    IRP-2 Sub-Station CC Camera Maintenance

    Posted onNovember 24, 2022November 24, 2022

    IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.

    Listen to the Message IRP-2 Sub-Station CC Camera MaintenanceContinue

  • DTW-122 & 123 Optical Fiber Maintenance
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Parvez

    DTW-122 & 123 Optical Fiber Maintenance

    Posted onNovember 24, 2022November 24, 2022

    DTW-122,123 optical fiber maintenance: We check TJ box in both dtw. Optical fiber checked by Leaser Light. Leaser light throw from dtw-122 to…

    Listen to the Message DTW-122 & 123 Optical Fiber MaintenanceContinue

  • ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | REPORTS

    DTW-221,217,123 VFD Controller And Serial Communication Check

    Posted onNovember 23, 2022November 23, 2022

    DTW-221,217,123 Modbus communication Problem DTW-221 & 217 new serial communication cable install DTW- 123 VFD controller and Modbus serial communication cable check Done….

    Listen to the Message DTW-221,217,123 VFD Controller And Serial Communication CheckContinue

  • Optical Fiber Maintenance
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez | REPORTS

    Optical Fiber Maintenance

    Posted onNovember 21, 2022November 22, 2022

    Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…

    Listen to the Message Optical Fiber MaintenanceContinue

  • ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

    DTW-221 Modbus Serial communication Problem

    Posted onNovember 20, 2022November 20, 2022

    when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…

    Listen to the Message DTW-221 Modbus Serial communication ProblemContinue

  • DTW-211 CCTV power is taken from main ups
    ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

    DTW-211 CCTV power is taken from main ups

    Posted onNovember 20, 2022November 20, 2022

    DTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.

    Listen to the Message DTW-211 CCTV power is taken from main upsContinue

  • IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

    IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change

    Posted onNovember 20, 2022November 20, 2022

    Previous control cable is damaged by ant .so we replace new control cable

    Listen to the Message IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable ChangeContinue

Page navigation

Previous PagePrevious 1 2 3 4 5 … 13 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers