DTW – 219,220 (10 nos) CC camera   optical fiber maintenance Complete .
ACTIVITY | CCTV | DAILY REPORTS | Jewel | Pappu | Parvez

DTW – 219,220 (10 nos) CC camera optical fiber maintenance Complete .

Posted onSeptember 27, 2022September 27, 2022

Listen to the Message DTW – 219,220 (10 nos) CC camera optical fiber maintenance Complete .Continue

ACTIVITY | CCTV | DTW | Jewel | NETWORK CONNECTIVITY | Parvez

A new ONU install at DTW-201.

Posted onSeptember 24, 2022September 24, 2022

Previous ONU frequently becomes unstable/hang. So replace the ONU.

Listen to the Message A new ONU install at DTW-201.Continue

DTW-201 CCTV checking
ACTIVITY | CCTV | DAILY REPORTS | DTW | Pappu | Parvez

DTW-201 CCTV checking

Posted onSeptember 22, 2022September 26, 2022

Problem: Do not show footage in NAV.Problem found: ONU & 1 Nos cc camera Problem found.

Listen to the Message DTW-201 CCTV checkingContinue

DTW-206 New POE Switch installing & CC Camera checking
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW-206 New POE Switch installing & CC Camera checking

Posted onSeptember 12, 2022September 12, 2022

Problem found: POE Switch & 4 NOS CC camera problem found.

Listen to the Message DTW-206 New POE Switch installing & CC Camera checkingContinue

ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW 106 and 223 CCTV Camera Network Establishment Equipment List

Posted onSeptember 11, 2022September 11, 2022

Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…

Listen to the Message DTW 106 and 223 CCTV Camera Network Establishment Equipment ListContinue

Optical Fiber restoration work at DTW103
ACTIVITY | CCTV | DTW103 | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

Optical Fiber restoration work at DTW103

Posted onSeptember 7, 2022September 24, 2022

In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

Listen to the Message Optical Fiber restoration work at DTW103Continue

ACTIVITY | CCTV | DTW | Jewel

CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .

Posted onSeptember 6, 2022September 6, 2022

Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-208 .Continue

ACTIVITY | CCTV | DTW | Jewel | MONTHLY REPORTS

CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .

Posted onSeptember 5, 2022September 6, 2022

Listen to the Message CCTV PANEL, UPS, POE SWITCH, ONU CLEANING COMPLETE DTW-203 .Continue

IRP-1/2 Optical Fiber Maintenance Report
ACTIVITY | CCTV | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

IRP-1/2 Optical Fiber Maintenance Report

Posted onAugust 30, 2022September 5, 2022

IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No.  Location  Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…

Listen to the Message IRP-1/2 Optical Fiber Maintenance ReportContinue

CCTV

CCTV Camera IP Address With Status

Posted onAugust 14, 2022November 13, 2022

IP By NAV SL. No IP Location Status Remarks 1 192.168.0.101 DTW101 (NAV/1) DOME ✅ 2 192.168.0.102 DTW101 (NAV/1) BULLET ✅ 3 192.168.0.103…

Listen to the Message CCTV Camera IP Address With StatusContinue

Page navigation

Previous PagePrevious 1 … 4 5 6

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers