Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • DTW -118 Radio Communication checking complete.
    ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pappu | Pending Issue

    DTW -118 Radio Communication checking complete.

    Posted onOctober 6, 2022October 12, 2022

    Observation: DTW 118 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 118, We checked up to 10 minutes. RSSI…

    Listen to the Message DTW -118 Radio Communication checking complete.Continue

  • DTW- 107 Radio Communication checking complete.
    ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pappu | Pending Issue

    DTW- 107 Radio Communication checking complete.

    Posted onOctober 6, 2022October 12, 2022

    Observation: DTW 107 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 107, We checked up to 10 minutes. In…

    Listen to the Message DTW- 107 Radio Communication checking complete.Continue

  • DTW 117 total 2 camera installation work
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu

    DTW 117 total 2 camera installation work

    Posted onOctober 6, 2022October 6, 2022

    ই পি অার বি এর কাজের জন্য যেই দুইটি সি সি ক্যামেরার পিলার সরানো হয়েছিলো ৷ সেই দুইটি সিসি ক্যামেরার তার ছিরে গিয়েছে…

    Listen to the Message DTW 117 total 2 camera installation workContinue

  • Instrumentation Findings of Month (October,2022)
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    Instrumentation Findings of Month (October,2022)

    Posted onOctober 4, 2022October 24, 2022

    Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…

    Listen to the Message Instrumentation Findings of Month (October,2022)Continue

  • DTW#201 CCTV Checking Maintenance Complete.
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW#201 CCTV Checking Maintenance Complete.

    Posted onOctober 2, 2022October 2, 2022

    Problem: Do not show footage in NAV.Problem found: POE Switch problem & 1 nos cc camera damage found and New POE Switch installing. Now problem…

    Listen to the Message DTW#201 CCTV Checking Maintenance Complete.Continue

  • DTW#105 CCTV Checking Maintenance Complete.
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW#105 CCTV Checking Maintenance Complete.

    Posted onOctober 2, 2022October 2, 2022

    Problem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…

    Listen to the Message DTW#105 CCTV Checking Maintenance Complete.Continue

  • IRP-1 sand filter “E” ultrasonic level transmitter installing.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    IRP-1 sand filter “E” ultrasonic level transmitter installing.

    Posted onSeptember 29, 2022September 29, 2022

    New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…

    Listen to the Message IRP-1 sand filter “E” ultrasonic level transmitter installing.Continue

  • IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue

    IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.

    Posted onSeptember 29, 2022October 12, 2022

    Listen to the Message IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.Continue

  • New parameter setting on an old ultrasonic level transmitter.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    New parameter setting on an old ultrasonic level transmitter.

    Posted onSeptember 28, 2022September 28, 2022

    Listen to the Message New parameter setting on an old ultrasonic level transmitter.Continue

  • Dtw-122 serial Comm.New UTP Cable installing complete.
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez

    Dtw-122 serial Comm.New UTP Cable installing complete.

    Posted onSeptember 28, 2022September 28, 2022

    Problem: : Modbus com interrupt problem.Problem found:The serial communication cable was cut by rat 🐁. then UTP Cable installing . new pump is…

    Listen to the Message Dtw-122 serial Comm.New UTP Cable installing complete.Continue

Page navigation

Previous PagePrevious 1 … 8 9 10 11 12 … 14 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers