  • DTW-110 Pump inspection & ready to run up.
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez

    DTW-110 Pump inspection & ready to run up.

    Posted onSeptember 18, 2022September 18, 2022

    Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…

    Listen to the Message DTW-110 Pump inspection & ready to run up.Continue

  • IRP#2 Sludge drying bed A float switch checking complete.
    ACTIVITY | DAILY REPORTS | Pappu

    IRP#2 Sludge drying bed A float switch checking complete.

    Posted onSeptember 17, 2022September 17, 2022

    Problem: SCADA always showing HI signal. Problem found: 1 Nos float switch problem. HI signal float switch problem & float switch connection terminal…

    Listen to the Message IRP#2 Sludge drying bed A float switch checking complete.Continue

  • Chlorine cylinder lode shell checking and maintenance.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    Chlorine cylinder lode shell checking and maintenance.

    Posted onSeptember 17, 2022September 17, 2022

    Problem found: lode shell connection terminal circuit problem found.

    Listen to the Message Chlorine cylinder lode shell checking and maintenance.Continue

  • IRP1 Sludge drying bed float switch checking.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Pending Issue

    IRP1 Sludge drying bed float switch checking.

    Posted onSeptember 15, 2022October 12, 2022

    Problem found: Sludge bed চেম্বারে কাদার পরিমান বেশি হওয়ার কারনে ৷ LoLo সিগনালের ফ্লোট সুইচটি কাদার মধ্যে অাটকে যাচ্ছে ৷তাই স্কাডাতে  HiHiLoLo সিগনাল…

    Listen to the Message IRP1 Sludge drying bed float switch checking.Continue

  • DTW-206 New POE Switch installing & CC Camera checking
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW-206 New POE Switch installing & CC Camera checking

    Posted onSeptember 12, 2022September 12, 2022

    Problem found: POE Switch & 4 NOS CC camera problem found.

    Listen to the Message DTW-206 New POE Switch installing & CC Camera checkingContinue

  • ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW 106 and 223 CCTV Camera Network Establishment Equipment List

    Posted onSeptember 11, 2022September 11, 2022

    Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…

    Listen to the Message DTW 106 and 223 CCTV Camera Network Establishment Equipment ListContinue

  • DTW- 206 RTU Panel Power System Checking & Problem Found.
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue

    DTW- 206 RTU Panel Power System Checking & Problem Found.

    Posted onSeptember 10, 2022October 12, 2022

    problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.

    Listen to the Message DTW- 206 RTU Panel Power System Checking & Problem Found.Continue

  • IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.

    Posted onSeptember 10, 2022September 10, 2022

    problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…

    Listen to the Message IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.Continue

  • DTW115 SCADA PACK INSTALL COMPLETE
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW115 SCADA PACK INSTALL COMPLETE

    Posted onSeptember 8, 2022September 9, 2022

    Listen to the Message DTW115 SCADA PACK INSTALL COMPLETEContinue

  • OGR Booster pump (E) checking complete.
    ACTIVITY | DAILY REPORTS | Jewel | MOV | Pappu | Parvez

    OGR Booster pump (E) checking complete.

    Posted onSeptember 7, 2022September 7, 2022

    Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E).  In this case the valve…

    Listen to the Message OGR Booster pump (E) checking complete.Continue

Page navigation

Previous PagePrevious 1 … 10 11 12 13 14 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers