ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

DTW-221 Modbus Serial communication Problem

Posted onNovember 20, 2022November 20, 2022

when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…

Listen to the Message DTW-221 Modbus Serial communication ProblemContinue

DTW-211 CCTV power is taken from main ups
ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

DTW-211 CCTV power is taken from main ups

Posted onNovember 20, 2022November 20, 2022

DTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.

Listen to the Message DTW-211 CCTV power is taken from main upsContinue

IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change

Posted onNovember 20, 2022November 20, 2022

Previous control cable is damaged by ant .so we replace new control cable

Listen to the Message IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable ChangeContinue

IRP-2 Server Rack Installation and Optical Fiber Rejoin
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

IRP-2 Server Rack Installation and Optical Fiber Rejoin

Posted onNovember 17, 2022November 17, 2022

IRP-2 Server Rack Installation and Optical Fiber Rejoin Done

Listen to the Message IRP-2 Server Rack Installation and Optical Fiber RejoinContinue

IRP-1 CC Camera Server Panel Cleaning
ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

IRP-1 CC Camera Server Panel Cleaning

Posted onNovember 16, 2022November 16, 2022

IRP-1. CC Camera Server Panel Cleaning Done

Listen to the Message IRP-1 CC Camera Server Panel CleaningContinue

IRP-2 Server Rak Installation
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

IRP-2 Server Rak Installation

Posted onNovember 16, 2022November 16, 2022

IRP-2 Sub-Station 1Nos New Server Rack Installation Done

Listen to the Message IRP-2 Server Rak InstallationContinue

DTW-104,105,106,107 CLEANING WORK
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

DTW-104,105,106,107 CLEANING WORK

Posted onNovember 15, 2022November 15, 2022

DTW-104,105,106,107 Cleaning Done

Listen to the Message DTW-104,105,106,107 CLEANING WORKContinue

ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

DTW-109 Radio Communication Check

Posted onNovember 14, 2022November 14, 2022

The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…

Listen to the Message DTW-109 Radio Communication CheckContinue

ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

DTW- 120 LIT And PIT Maintenance

Posted onNovember 14, 2022November 14, 2022

DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…

Listen to the Message DTW- 120 LIT And PIT MaintenanceContinue

ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

OPTICAL FIBER MAINTENANCE AT DTW-104

Posted onNovember 14, 2022November 14, 2022

In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…

Listen to the Message OPTICAL FIBER MAINTENANCE AT DTW-104Continue

Page navigation

Previous PagePrevious 1 … 3 4 5 6 7 … 14 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers