PIT maintenance work report (IRP-2)
ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

PIT maintenance work report (IRP-2)

Posted onNovember 8, 2022November 8, 2022

PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist

Listen to the Message PIT maintenance work report (IRP-2)Continue

DTW-106 CC Camera Establishment
ACTIVITY | CCTV | DAILY REPORTS | DTW

DTW-106 CC Camera Establishment

Posted onNovember 7, 2022December 26, 2022

1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity

Listen to the Message DTW-106 CC Camera EstablishmentContinue

DTW-114 CC Camera Install
ACTIVITY | CCTV | DAILY REPORTS | DTW

DTW-114 CC Camera Install

Posted onNovember 6, 2022November 6, 2022

1.DTW-114 1Nos Camera Install Done 2.New UTP Cable Install 3.Connector Change Now DTW-114 5Nos Camera in Operation

Listen to the Message DTW-114 CC Camera InstallContinue

DTW-113 Scada Pack Install
ACTIVITY | DAILY REPORTS | DTW

DTW-113 Scada Pack Install

Posted onNovember 6, 2022November 6, 2022

DTW-113 Scada Pack Programing And Install Done

Listen to the Message DTW-113 Scada Pack InstallContinue

DTW-102 Scada Pack Install
ACTIVITY | DAILY REPORTS | DTW

DTW-102 Scada Pack Install

Posted onNovember 6, 2022November 6, 2022

DTW-102 Scada Pack Programing And Install Done

Listen to the Message DTW-102 Scada Pack InstallContinue

DAILY REPORTS | REPORTS

MOV REPORT 2022

Posted onNovember 3, 2022December 11, 2022

MOV Report 2022 November IRP1 SL NO MOV ID Status Remarks 1 2V03A ✅OK 2 2V03B ✅OK 3 2V03C ✅OK 4 2V03D ✅OK…

Listen to the Message MOV REPORT 2022Continue

DTW – 111 LIT Maintenance Work Complete.
ACTIVITY | DAILY REPORTS | DTW | Pappu

DTW – 111 LIT Maintenance Work Complete.

Posted onNovember 1, 2022November 1, 2022

Dtw 111 LIT Reinstallation complete . DTW 111 থেকে পুরাতন একটি LIT স্টোরে জমা দেয়া হয়েছে ৷

Listen to the Message DTW – 111 LIT Maintenance Work Complete.Continue

ACTIVITY | DAILY REPORTS | REPORTS

FIT Report 2022

Posted onOctober 25, 2022December 11, 2022

FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…

Listen to the Message FIT Report 2022Continue

ACTIVITY | DAILY REPORTS | REPORTS

SCADAPACK Report 2022

Posted onOctober 25, 2022December 11, 2022

SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…

Listen to the Message SCADAPACK Report 2022Continue

ACTIVITY | DAILY REPORTS | REPORTS

VFD Report 2022

Posted onOctober 25, 2022December 11, 2022

VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…

Listen to the Message VFD Report 2022Continue

Page navigation

Previous PagePrevious 1 … 5 6 7 8 9 … 14 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers