Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • ACTIVITY | DTW | Jewel | Pappu | Parvez | REPORTS

    DTW’S PRESSURE INDICATOR TRANSMITTER REPORT

    Posted onSeptember 24, 2022September 24, 2022

    SAVAR-KERANIGANJ WELL FIELD PLANT DTW,S PRESSURE INDICATOR TRANSMITTER REPORT (24.09.2022) DTW NO. VALUE STATUS DTW NO. VALUE STATUS 101 2.3  OK 201 1.9…

    Listen to the Message DTW’S PRESSURE INDICATOR TRANSMITTER REPORTContinue

  • DTW-117 & 118 UVR Related M/C checking.
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue

    DTW-117 & 118 UVR Related M/C checking.

    Posted onSeptember 22, 2022October 12, 2022

    Problem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…

    Listen to the Message DTW-117 & 118 UVR Related M/C checking.Continue

  • ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue

    OGR Booster pump E checking & maintenance.

    Posted onSeptember 22, 2022October 12, 2022

    Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…

    Listen to the Message OGR Booster pump E checking & maintenance.Continue

  • DTW-201 CCTV checking
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Pappu | Parvez

    DTW-201 CCTV checking

    Posted onSeptember 22, 2022September 26, 2022

    Problem: Do not show footage in NAV.Problem found: ONU & 1 Nos cc camera Problem found.

    Listen to the Message DTW-201 CCTV checkingContinue

  • 4 nos Monitoring Well Level Sensor Installation Complete.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    4 nos Monitoring Well Level Sensor Installation Complete.

    Posted onSeptember 21, 2022September 21, 2022

    1 :MW03B 2: MW14A 3:MW08A 4: MW13B

    Listen to the Message 4 nos Monitoring Well Level Sensor Installation Complete.Continue

  • OGR booster pump D winding temperature & Bearing temperature sensor checking.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    OGR booster pump D winding temperature & Bearing temperature sensor checking.

    Posted onSeptember 18, 2022September 18, 2022

    Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….

    Listen to the Message OGR booster pump D winding temperature & Bearing temperature sensor checking.Continue

  • IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance
    ACTIVITY | DAILY REPORTS | Pappu | Parvez

    IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance

    Posted onSeptember 18, 2022September 18, 2022

    Problem: SCADA always showing HI signal. Problem found: 1 NOS float switch problem found. A good sensor in HIHI position is replaced with…

    Listen to the Message IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor MaintenanceContinue

  • DTW-110 Pump inspection & ready to run up.
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez

    DTW-110 Pump inspection & ready to run up.

    Posted onSeptember 18, 2022September 18, 2022

    Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…

    Listen to the Message DTW-110 Pump inspection & ready to run up.Continue

  • IRP#2 Sludge drying bed A float switch checking complete.
    ACTIVITY | DAILY REPORTS | Pappu

    IRP#2 Sludge drying bed A float switch checking complete.

    Posted onSeptember 17, 2022September 17, 2022

    Problem: SCADA always showing HI signal. Problem found: 1 Nos float switch problem. HI signal float switch problem & float switch connection terminal…

    Listen to the Message IRP#2 Sludge drying bed A float switch checking complete.Continue

  • Chlorine cylinder lode shell checking and maintenance.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    Chlorine cylinder lode shell checking and maintenance.

    Posted onSeptember 17, 2022September 17, 2022

    Problem found: lode shell connection terminal circuit problem found.

    Listen to the Message Chlorine cylinder lode shell checking and maintenance.Continue

Page navigation

Previous PagePrevious 1 … 13 14 15 16 17 … 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers