    Report: IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.

    Posted onJuly 5, 2022July 5, 2022

    Cleaning Status: Completed. Findings: No problem found.

    Listen to the Message Report: IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.Continue

  • REPORTS

    Report: IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.

    Posted onJuly 5, 2022July 5, 2022

    Device Status OLT : OK UPS: OK ONU: Ok POE Switch : OK Findings: Too much dust inside all device. Suggestion: New separate…

    Listen to the Message Report: IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.Continue

  • REPORTS

    IRP-1 DTW (101 to123) SCADAPACK, TRIO JR,LIT & PIT REPORT.

    Posted onJuly 5, 2022July 5, 2022

    DTW SCADAPACK TRIO JR LIT PIT COMMENTS 101 OK OK OK OK 102 OK OK NOT OK OK 103 OK OK OK OK…

    Listen to the Message IRP-1 DTW (101 to123) SCADAPACK, TRIO JR,LIT & PIT REPORT.Continue

  • REPORTS

    IRP-1 All DTW NEV Voltage Report

    Posted onJuly 4, 2022July 5, 2022

    NEV voltage [Report] SL No. Location Voltage Comments 01. DTW-101 37mV 02. DTW-102 170mV 03. DTW-103 231mV 04. DTW-104 1.1V 05. DTW-105 42mV…

    Listen to the Message IRP-1 All DTW NEV Voltage ReportContinue

  • REPORTS

    DTW UVR, ELD, GiMAC , ACB & LV Panel P/M of Month [Report]

    Posted onJuly 4, 2022July 5, 2022

    SL No. DTW No UVR ELD GiMAC ACB Comments 01. 101 02. 102 03. 103 04. 104 05. 105 06. 106 07. 107…

    Listen to the Message DTW UVR, ELD, GiMAC , ACB & LV Panel P/M of Month [Report]Continue

  • IRP2 Sand Filter MOV 3V09L Backwash Time Fault Showing
    MOV

    IRP2 Sand Filter MOV 3V09L Backwash Time Fault Showing

    Posted onJune 7, 2022

    Listen to the Message IRP2 Sand Filter MOV 3V09L Backwash Time Fault ShowingContinue

  • DTW-202 Running Time Motor Frequency (-) Minus Showing
    DAILY REPORTS

    DTW-202 Running Time Motor Frequency (-) Minus Showing

    Posted onMay 8, 2022

    Issue Forward to the electrical team.

    Listen to the Message DTW-202 Running Time Motor Frequency (-) Minus ShowingContinue

  • DTW 216 Nearby Road Fiber Optic Cable Maintenance
    DAILY REPORTS

    DTW 216 Nearby Road Fiber Optic Cable Maintenance

    Posted onMay 8, 2022May 8, 2022

    DHAKA WASA TEAM ICE জীবনের ঝুকি নিয়ে ICE Team এভাবেই কাজ করে যাচ্ছে।

    Listen to the Message DTW 216 Nearby Road Fiber Optic Cable MaintenanceContinue

  • Monitoring Well Sensor Installation
    DAILY REPORTS

    Monitoring Well Sensor Installation

    Posted onApril 28, 2022April 28, 2022

    Listen to the Message Monitoring Well Sensor InstallationContinue

  • DTW 223 SCADA PACK Commissioning.
    DAILY REPORTS

    DTW 223 SCADA PACK Commissioning.

    Posted onApril 26, 2022

    Listen to the Message DTW 223 SCADA PACK Commissioning.Continue

Page navigation

Previous PagePrevious 1 … 17 18 19 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers