DTW215 Construction Status

Posted onDecember 20, 2022December 20, 2022

Google Map Location Lat/Long: 23°44’21.0″N 90°24’29.3″E Date: 2022.12.20 Observation: Recommendation: Pictures: Date: 2022.12.22 Date: 2022.12.24 Date: 2022.12.26

Listen to the Message DTW215 Construction StatusContinue

DTW-Camera Lens Cleaning
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

DTW-Camera Lens Cleaning

Posted onDecember 14, 2022December 18, 2022

DTW-101,102,103,104,107,109,110,111,209,206,207,205,208,203,201 Camera Lens Cleaning Done There are too much dust accumulate on the camera lens and the video footage isn’t clear to understand.

Listen to the Message DTW-Camera Lens CleaningContinue

DTW-120 CCTV Maintenance
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

DTW-120 CCTV Maintenance

Posted onDecember 13, 2022December 13, 2022

DTW-120 CCTV Maintenance There was connector Problem. Now DTW-120 (5 nos ) camera operation in NAV-2

Listen to the Message DTW-120 CCTV MaintenanceContinue

IRP-2 Sub-Station Re cleaning
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS

IRP-2 Sub-Station Re cleaning

Posted onDecember 13, 2022December 13, 2022

There was so much dust

Listen to the Message IRP-2 Sub-Station Re cleaningContinue

CCTV modification work for Dual power source
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

CCTV modification work for Dual power source

Posted onDecember 13, 2022December 13, 2022

CCTV modification work for Dual power source Done Now CCTV continuous View remain All time.

Listen to the Message CCTV modification work for Dual power sourceContinue

DTW-212 & 222 CCTV Maintenance
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

DTW-212 & 222 CCTV Maintenance

Posted onDecember 11, 2022December 11, 2022

DTW-212 & 222 CCTV Maintenance Done Connector Change Now DTW-212 & 222 10 No’s CCTV Operation in NAV

Listen to the Message DTW-212 & 222 CCTV MaintenanceContinue

IRP-1 All LOP Panel Cleaning
ACTIVITY | DAILY REPORTS | Jewel | REPORTS

IRP-1 All LOP Panel Cleaning

Posted onDecember 11, 2022December 11, 2022

IRP-1 All LOP Panel Cleaning Done

Listen to the Message IRP-1 All LOP Panel CleaningContinue

DTW-201,202,203,206,208,209,210,211 CCTV Maintenance
ACTIVITY | CCTV | DAILY REPORTS | DTW | Parvez | REPORTS

DTW-201,202,203,206,208,209,210,211 CCTV Maintenance

Posted onDecember 11, 2022December 11, 2022

1.Camera IP reset 2.New IP install

Listen to the Message DTW-201,202,203,206,208,209,210,211 CCTV MaintenanceContinue

Office Building CCTV Install
ACTIVITY | CCTV | DAILY REPORTS | Parvez | REPORTS

Office Building CCTV Install

Posted onDecember 9, 2022December 9, 2022

IRP-1 Office Building 1 Nos New Camera Install For Security Purpose

Listen to the Message Office Building CCTV InstallContinue

FCP Panel Cleaning
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS

FCP Panel Cleaning

Posted onDecember 9, 2022December 9, 2022

IRP-1 Sand Filter FCP Panel Cleaning Done

Listen to the Message FCP Panel CleaningContinue

Page navigation

Previous PagePrevious 1 2 3 4 … 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers