Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
CCTV Maintenance At DTW-103
ACTIVITY | CCTV | DTW | DTW103

CCTV Maintenance At DTW-103

Posted onOctober 27, 2022October 27, 2022

CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting

Listen to the Message CCTV Maintenance At DTW-103Continue

Optical Fiber Maintenance
ACTIVITY | CCTV | DTW

Optical Fiber Maintenance

Posted onOctober 26, 2022October 26, 2022

Due To Strom the optical fiber cable fall down and damage near DTW-209 to 206 Now Everything is Normal

Listen to the Message Optical Fiber MaintenanceContinue

Optical Fiber Cable Rejoin With Poll
ACTIVITY | CCTV | DTW

Optical Fiber Cable Rejoin With Poll

Posted onOctober 25, 2022October 26, 2022

Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal

Listen to the Message Optical Fiber Cable Rejoin With PollContinue

Optical Fiber Maintenance
ACTIVITY | CCTV | DTW

Optical Fiber Maintenance

Posted onOctober 25, 2022October 25, 2022

Due To Strom the optical fiber cable fall down and damage near DTW-121 to 122 now everything is normal

Listen to the Message Optical Fiber MaintenanceContinue

Optical Fiber Network Report 2022
ACTIVITY | CCTV | NETWORK CONNECTIVITY

Optical Fiber Network Report 2022

Posted onOctober 25, 2022December 11, 2022

Optical Fiber Network Status October 2022 SL NO. Location In Between DTW Near Pole No Lat/Long Affected Location Remarks 01 Baherchor to Bottoli…

Listen to the Message Optical Fiber Network Report 2022Continue

ACTIVITY | DAILY REPORTS | REPORTS

FIT Report 2022

Posted onOctober 25, 2022December 11, 2022

FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…

Listen to the Message FIT Report 2022Continue

ACTIVITY | DAILY REPORTS | REPORTS

SCADAPACK Report 2022

Posted onOctober 25, 2022December 11, 2022

SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…

Listen to the Message SCADAPACK Report 2022Continue

ACTIVITY | DAILY REPORTS | REPORTS

VFD Report 2022

Posted onOctober 25, 2022December 11, 2022

VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…

Listen to the Message VFD Report 2022Continue

ACTIVITY | DAILY REPORTS | REPORTS

PIT Report 2022

Posted onOctober 24, 2022December 11, 2022

PIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…

Listen to the Message PIT Report 2022Continue

DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.
ACTIVITY | DAILY REPORTS | DTW | Pappu

DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.

Posted onOctober 24, 2022October 24, 2022

DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Problem: PIT value not showing in the SCADA.Problem found: 1. PIT 24v DC…

Listen to the Message DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Continue

Page navigation

Previous PagePrevious 1 … 7 8 9 10 11 … 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers