Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
Uncategorized

DTW#223 CCTV POLE NUT-BOLD FITTING WORK COMPLETE.

Posted onSeptember 28, 2022September 28, 2022

Listen to the Message DTW#223 CCTV POLE NUT-BOLD FITTING WORK COMPLETE.Continue

Uncategorized

SIGNAL TRANSMITTER

Posted onSeptember 26, 2022

Brand Name: SHINHO SYSTEM Product Name: Signal Transmitter Model No/Part No: P-ISO, P UNIT-Series SPECIFICATION OF SIGNAL TRANSMITTER SL NO. Specification Criteria Specifications…

Listen to the Message SIGNAL TRANSMITTERContinue

Fuse Holder
Uncategorized

Fuse Holder

Posted onSeptember 26, 2022September 26, 2022

Brand Name: KACON Product Name: Fuse Holder Model No/Part No: KF-32L SPECIFICATION OF KACON FUSE HOLDE SL NO. Specification Criteria Specification 01 Voltage…

Listen to the Message Fuse HolderContinue

TOP TOUCH OPERATION PANEL (HMI)
Uncategorized

TOP TOUCH OPERATION PANEL (HMI)

Posted onSeptember 25, 2022September 25, 2022

Brand Name: M2I CORPORATION. Product Name: TOP TOUCH OPERATION PANEL Model No/Part No: XTOP12TS-SA SPECIFICATION OF TOUCH OPERATION PANEL SL NO. Specification criteria…

Listen to the Message TOP TOUCH OPERATION PANEL (HMI)Continue

LIGHT STAR PANEL POWER METER
Uncategorized

LIGHT STAR PANEL POWER METER

Posted onSeptember 25, 2022

Brand Name: Light Star Product Name: Panel Power Meter Model No/Part No: KDX-AC Country of Origin: Korea Country of Shipment: As per country…

Listen to the Message LIGHT STAR PANEL POWER METERContinue

Surge Protection Device
Uncategorized

Surge Protection Device

Posted onSeptember 24, 2022September 24, 2022

Surge Protection Device: (TIS.24S) >Designed and manufactured to apply to LPZ (Lightning Protection Zone) 2 > Satisfies KS C IEC 61643-21, ANSI/IEEE C62.41…

Listen to the Message Surge Protection DeviceContinue

Uncategorized

DTW 223 CCTV PILLAR ARRANGEMENT & CABLING WORK COMPLETE

Posted onSeptember 19, 2022September 19, 2022

Listen to the Message DTW 223 CCTV PILLAR ARRANGEMENT & CABLING WORK COMPLETEContinue

Uncategorized

DTW#223 CCTV

Posted onSeptember 19, 2022September 19, 2022

Listen to the Message DTW#223 CCTVContinue

Uncategorized

DTW223 CCTV POOL BEARS INSTALLING COMPLETE

Posted onSeptember 15, 2022September 15, 2022

Listen to the Message DTW223 CCTV POOL BEARS INSTALLING COMPLETEContinue

Uncategorized

PWTP Micro SCADA

Posted onSeptember 14, 2022September 14, 2022

SL. No Name/Brand Model Location Type Remarks 01 CONSERVER WXD216NCR PWTP/IPS/BPS Micro SCADA 02 Ethernet Switch H3C S1016/1024 PWTP/IPS/BPS Switch 03 04 05…

Listen to the Message PWTP Micro SCADAContinue

Page navigation

Previous PagePrevious 1 … 10 11 12 13 14 … 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers