  • DTW203 LV panel, ACB, UVR ELD checking & cleaning.
    Uncategorized

    DTW203 LV panel, ACB, UVR ELD checking & cleaning.

    Posted onSeptember 5, 2022September 5, 2022

    Listen to the Message DTW203 LV panel, ACB, UVR ELD checking & cleaning.Continue

  • MONTHLY REPORTS | Uncategorized

    MONTHLY REPORT 2022

    Posted onAugust 17, 2022August 21, 2022

    Listen to the Message MONTHLY REPORT 2022Continue

  • Uncategorized

    1 KVA Online UPS (C Series)

    Posted onAugust 7, 2022August 7, 2022

    1 KVA Online UPS (C Series)

    Listen to the Message 1 KVA Online UPS (C Series)Continue

  • Uncategorized

    DTW-120 CCTV UPS INSTALL

    Posted onJuly 27, 2022July 27, 2022

    Listen to the Message DTW-120 CCTV UPS INSTALLContinue

  • DTW-120 CCTV UPS INSTALL
    Uncategorized

    DTW-120 CCTV UPS INSTALL

    Posted onJuly 27, 2022July 27, 2022

    Listen to the Message DTW-120 CCTV UPS INSTALLContinue

  • Uncategorized

    IRP-2 inlet FIT-3001 maintenance & reinstall

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message IRP-2 inlet FIT-3001 maintenance & reinstallContinue

  • Uncategorized

    DTW-205 VFD start/stop problem in remote state has been solved

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message DTW-205 VFD start/stop problem in remote state has been solvedContinue

  • GIMAC-I power meter reset, reconfigure & new cable install at dtw-207
    Uncategorized

    GIMAC-I power meter reset, reconfigure & new cable install at dtw-207

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message GIMAC-I power meter reset, reconfigure & new cable install at dtw-207Continue

  • Uncategorized

    IRP-2 Sandfilter Bluer’s VFD (3MO1A & 3MO1B) cleaning, checking and maintenance complete (02/07/2022)

    Posted onJuly 7, 2022July 7, 2022

    Listen to the Message IRP-2 Sandfilter Bluer’s VFD (3MO1A & 3MO1B) cleaning, checking and maintenance complete (02/07/2022)Continue

  • Uncategorized

    Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )

    Posted onJuly 5, 2022July 5, 2022

    SL No. DTW No Cleaning POE Switch ONU UPS 01. 101 Completed OK OK Problem 02. 102 Completed OK OK Problem 03. 103…

    Listen to the Message Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )Continue

Page navigation

Previous PagePrevious 1 … 12 13 14 15 16 … 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers