Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • Uncategorized

    1 KVA Online UPS (C Series)

    Posted onAugust 7, 2022August 7, 2022

    1 KVA Online UPS (C Series)

    Listen to the Message 1 KVA Online UPS (C Series)Continue

  • Uncategorized

    DTW-120 CCTV UPS INSTALL

    Posted onJuly 27, 2022July 27, 2022

    Listen to the Message DTW-120 CCTV UPS INSTALLContinue

  • DTW-120 CCTV UPS INSTALL
    Uncategorized

    DTW-120 CCTV UPS INSTALL

    Posted onJuly 27, 2022July 27, 2022

    Listen to the Message DTW-120 CCTV UPS INSTALLContinue

  • Uncategorized

    IRP-2 inlet FIT-3001 maintenance & reinstall

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message IRP-2 inlet FIT-3001 maintenance & reinstallContinue

  • Uncategorized

    DTW-205 VFD start/stop problem in remote state has been solved

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message DTW-205 VFD start/stop problem in remote state has been solvedContinue

  • GIMAC-I power meter reset, reconfigure & new cable install at dtw-207
    Uncategorized

    GIMAC-I power meter reset, reconfigure & new cable install at dtw-207

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message GIMAC-I power meter reset, reconfigure & new cable install at dtw-207Continue

  • Uncategorized

    IRP-2 Sandfilter Bluer’s VFD (3MO1A & 3MO1B) cleaning, checking and maintenance complete (02/07/2022)

    Posted onJuly 7, 2022July 7, 2022

    Listen to the Message IRP-2 Sandfilter Bluer’s VFD (3MO1A & 3MO1B) cleaning, checking and maintenance complete (02/07/2022)Continue

  • Uncategorized

    Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )

    Posted onJuly 5, 2022July 5, 2022

    SL No. DTW No Cleaning POE Switch ONU UPS 01. 101 Completed OK OK Problem 02. 102 Completed OK OK Problem 03. 103…

    Listen to the Message Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )Continue

  • APP FOR 2022-23
    Uncategorized

    APP FOR 2022-23

    Posted onJuly 5, 2022July 24, 2022

    APP for Fiscal Year 2022-23 সাভার কেরানীগঞ্জ ওয়েল ফিল্ড প্ল্যান্ট, ঢাকা ওয়াসার অত্যন্ত গুরুতপূর্ন ও মডেল পানি শোধনাগার। প্ল্যান্টটি সম্পুর্ন অটোমেটেড এবং স্ক্যাডা…

    Listen to the Message APP FOR 2022-23Continue

  • Uncategorized

    IRP-1 DTW (101 to123) VFD & VFD CONTROLLER REPORT.

    Posted onJuly 5, 2022July 5, 2022

    DTW VFD VFD CONTROLLER COMMENTS 101 OK OK 102 OK OK 103 OK NOT OK 104 OK OK 105 OK OK 106 OK…

    Listen to the Message IRP-1 DTW (101 to123) VFD & VFD CONTROLLER REPORT.Continue

Page navigation

Previous PagePrevious 1 … 12 13 14 15 16 … 88 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers