Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • Uncategorized

    WID567: DTW-203 & 208 Flow meter problem.

    Posted onNovember 20, 2023November 20, 2023

    Findings: Function Generator doesn’t work properly. Action Taken: 1. Physically check the connection 2. Check the pulse signal from SCADAPACK & pulse generator….

    Listen to the Message WID567: DTW-203 & 208 Flow meter problem.Continue

  • Uncategorized

    WID566: NAV-3 & NAV-4 Cameras aren’t shown in display.

    Posted onNovember 20, 2023November 20, 2023

    Findings: 1. Optical fiber are found damaged. Action Taken: 1. OTDR test . Cable disconnect at 0.7634 km. 2. Physically cable & TJ…

    Listen to the Message WID566: NAV-3 & NAV-4 Cameras aren’t shown in display.Continue

  • Uncategorized

    PWID42:DTW220 Bullet camera glass and cage cleaning.

    Posted onNovember 16, 2023November 16, 2023

    Listen to the Message PWID42:DTW220 Bullet camera glass and cage cleaning.Continue

  • DAILY REPORTS | DTW | Parvez | REPORTS | Uncategorized

    WID562:DTW217 flow value is not shown in SCADA

    Posted onNovember 15, 2023November 16, 2023

    Findings: The cable was disconnected. Action taken: Dressing the cable and reconnect.

    Listen to the Message WID562:DTW217 flow value is not shown in SCADAContinue

  • Uncategorized

    WID559: DTW104 Radio communication error check.

    Posted onNovember 14, 2023November 14, 2023

    Action Taken: 1. Check SPD. 2. Check Antenna cable. 3. Checking the RSSI value changing the direction of Antenna. Result: After doing the…

    Listen to the Message WID559: DTW104 Radio communication error check.Continue

  • Uncategorized

    Preventive working schedule-Nov2023( Md. Parvas)

    Posted onNovember 14, 2023November 29, 2023

    SL. No. Date WID: TaskDescription Location Manpower Remarks 2 November PWID60: DTW-101 RTU, LIT, PIT, FIT clean check & maintenance. DTW-101 Parvas-AT Ahsanullah-Ele…

    Listen to the Message Preventive working schedule-Nov2023( Md. Parvas)Continue

  • Uncategorized

    Preventive work schedule Nov-2023 (Kazi Jewel)

    Posted onNovember 14, 2023November 15, 2023

    SL. No. Date WID: TaskDescription Location Manpower Remarks 01 1 November WID1: DTW-207 Optical Fiber maintenance. DTW-206 & 207 Kazi Jewel-HRasel Mizi-HGias Uddin-H…

    Listen to the Message Preventive work schedule Nov-2023 (Kazi Jewel)Continue

  • Uncategorized

    LS Electronic Motor Protection Relay (DMP60-TZ)

    Posted onNovember 14, 2023

    Brand Name: LS Product Name: Electronic Motor Protection Relay Model No/Part No: DMP60-TZ SPECIFICATION OF LS Electronic Motor Protection Relay (DMP60-TZ) SL NO….

    Listen to the Message LS Electronic Motor Protection Relay (DMP60-TZ)Continue

  • Uncategorized

    LS Electronic Motor Protection Relay (DMP36-TZ)

    Posted onNovember 13, 2023November 14, 2023

    Brand Name: LS Product Name: Electronic Motor Protection Relay Model No/Part No: DMP36-TZ SPECIFICATION OF LS Electronic Motor Protection Relay (DMP36-TZ) SL NO….

    Listen to the Message LS Electronic Motor Protection Relay (DMP36-TZ)Continue

  • Uncategorized

    WID551: FIT 3001,3004,2001,4001,4002,4004 Flow Sensor signal efficiency check.

    Posted onNovember 9, 2023November 13, 2023

    Listen to the Message WID551: FIT 3001,3004,2001,4001,4002,4004 Flow Sensor signal efficiency check.Continue

Page navigation

Previous PagePrevious 1 … 6 7 8 9 10 … 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers