Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • Uncategorized

    WID:552 IRP2 Sandfilter MOV-3V05 fault showing problem check.

    Posted onNovember 8, 2023December 11, 2023

    Findings: The relay always stay energize getting power from Digital Output I/O card. So sandfilter can’t maintain the backwash sequence. That’s why ,…

    Listen to the Message WID:552 IRP2 Sandfilter MOV-3V05 fault showing problem check.Continue

  • Uncategorized

    WID: DTW123 ELD installation and Leakage Current check.

    Posted onNovember 8, 2023November 8, 2023

    Findings: 1. When we power up the UPS breaker, At that moment the ELD’s Fuse burn.

    Listen to the Message WID: DTW123 ELD installation and Leakage Current check.Continue

  • Uncategorized

    DTW 116,117,118,119,120,121,122,123 RTU, LIT, PIT, FIT check and maintenance.

    Posted onNovember 8, 2023November 8, 2023

    PWID: 74, 75, 76, 77, 78, 79, 80, 81 It’s just a preventive work to avoid upcoming problems of Field Devices & Instruments.

    Listen to the Message DTW 116,117,118,119,120,121,122,123 RTU, LIT, PIT, FIT check and maintenance.Continue

  • Uncategorized

    WID-243: (NEW)DTW-116 communication fully error

    Posted onApril 8, 2023April 8, 2023

    DTW-116 communication fully error Location: IRP1 Problem Start Date: 6/4/2023 Identified By: Ruhul Amin Solve at: Total Time Required: Total Manpower Deployed: Lead…

    Listen to the Message WID-243: (NEW)DTW-116 communication fully errorContinue

  • Uncategorized

    SCADA Daily Report

    Posted onApril 8, 2023April 8, 2023

    ICE ISSUES SL No Work ID Date Description Status Remarks / Log 78 243 6/4/2023 (NEW)DTW-116 communication fully error.now it’s locally running pending…

    Listen to the Message SCADA Daily ReportContinue

  • COMPONENTS REQUIRED FOR CCTV DUAL SOURCE MODIFICATION
    Uncategorized

    COMPONENTS REQUIRED FOR CCTV DUAL SOURCE MODIFICATION

    Posted onFebruary 9, 2023February 9, 2023

    COMPONENTS REQUIRED FOR CCTV DUAL SOURCE MODIFICATION SL NO. PRODUCT NAME PRODUCT MODEL QUANTITY 01 MAGNETIC CONTACT(GMR-4M Mini-Magnetic Contactors Relays (AC Coil) LG…

    Listen to the Message COMPONENTS REQUIRED FOR CCTV DUAL SOURCE MODIFICATIONContinue

  • CCTV UPS BATTERY SPECIFICATION
    Uncategorized

    CCTV UPS BATTERY SPECIFICATION

    Posted onFebruary 9, 2023February 9, 2023

    CCTV UPS BATTERY SPECIFICATION NECRON provides produced types of VRLA, OPzS, Gel, Ni-Cd, Li-Ion according to the international standards. High quality NECRON’s batteries…

    Listen to the Message CCTV UPS BATTERY SPECIFICATIONContinue

  • DTWs as on Locally Operational
    Uncategorized

    DTWs as on Locally Operational

    Posted onDecember 26, 2022December 27, 2022

    DTW101 Problem: Dtw-101 Sometimes the pump stops suddenly. This has happened time and time again. There is no fault in SCADA. Field check…

    Listen to the Message DTWs as on Locally OperationalContinue

  • Optical Fiber recheck for DTW-122 To 123
    Uncategorized

    Optical Fiber recheck for DTW-122 To 123

    Posted onDecember 17, 2022

    Still Fiber Loss

    Listen to the Message Optical Fiber recheck for DTW-122 To 123Continue

  • Optical Fiber Maintenance For DTW-115 To 119
    Uncategorized

    Optical Fiber Maintenance For DTW-115 To 119

    Posted onDecember 17, 2022December 17, 2022

    Fiber Join and cable arrangement Now DTW-115,117,118,119 CCTV Operation in NAV-2

    Listen to the Message Optical Fiber Maintenance For DTW-115 To 119Continue

Page navigation

Previous PagePrevious 1 … 7 8 9 10 11 … 20 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers