Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
DTW- 208 Fault Come in CCTV UPS
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

DTW- 208 Fault Come in CCTV UPS

Posted onNovember 9, 2022November 9, 2022

Dtw-208 CCTV power supply is received from directly LV panel. Frequently Fault come in UPS. Now Everything is Normal.

Listen to the Message DTW- 208 Fault Come in CCTV UPSContinue

PIT Maintenance Work Report (IRP-1)
ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

PIT Maintenance Work Report (IRP-1)

Posted onNovember 9, 2022November 9, 2022

DTW-114 PIT ok. DTW-113 PIT ok but scadapack AO port damaged. DTW-104 PIT doesn’t exist. DTW-105 PIT ok (regeneration on going)

Listen to the Message PIT Maintenance Work Report (IRP-1)Continue

DTW-107 Radio Communication Check and Maintenance
ACTIVITY | DAILY REPORTS | DTW | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

DTW-107 Radio Communication Check and Maintenance

Posted onNovember 8, 2022November 8, 2022

Radio Communication problem solve and there are graphical problem in SCADA DTW 107 radio comm. checking complete.গত ৩১/১০/২০২২ তারিখ বিকাল 06:18 pm এর…

Listen to the Message DTW-107 Radio Communication Check and MaintenanceContinue

PIT maintenance work report (IRP-2)
ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

PIT maintenance work report (IRP-2)

Posted onNovember 8, 2022November 8, 2022

PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist

Listen to the Message PIT maintenance work report (IRP-2)Continue

LOCAL PIPE LINE e-PRV & MOV MODIFICATION WORK.
ACTIVITY | DTW | Jewel | Pappu

LOCAL PIPE LINE e-PRV & MOV MODIFICATION WORK.

Posted onOctober 29, 2022October 29, 2022

Listen to the Message LOCAL PIPE LINE e-PRV & MOV MODIFICATION WORK.Continue

EPRV work with DTW 103 by ICE Team & SEL
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

EPRV work with DTW 103 by ICE Team & SEL

Posted onOctober 22, 2022October 22, 2022

Listen to the Message EPRV work with DTW 103 by ICE Team & SELContinue

DTW 104 CCTV maintenance complete.
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel

DTW 104 CCTV maintenance complete.

Posted onOctober 10, 2022October 10, 2022

Problem: 01 nos CC Camera Do not show footage in NAV.Problem found: Automatic IP has been changed in the dome Camera. Than IP…

Listen to the Message DTW 104 CCTV maintenance complete.Continue

ACTIVITY | DTW | Jewel | Pappu | Parvez

CCTV camera maintenance & optical fiber rearrangement at DTW-117

Posted onOctober 6, 2022October 6, 2022

In DTW-117, there are 2 Nos maintenance and installation : 1. Optical fiber rearrangement. 2. 2 Nos new camera install. 3. 44 meter…

Listen to the Message CCTV camera maintenance & optical fiber rearrangement at DTW-117Continue

CCTV maintenance at DTW-103
ACTIVITY | CCTV | DTW | Jewel | Parvez

CCTV maintenance at DTW-103

Posted onOctober 6, 2022October 6, 2022

In DTW-103, there are 3 Nos maintenance and installation : 1. IP configure in CCTV camera. 2. 2 Nos new camera install. 3….

Listen to the Message CCTV maintenance at DTW-103Continue

CCTV maintenance at DTW-109
ACTIVITY | CCTV | DTW | Jewel | Parvez | Uncategorized

CCTV maintenance at DTW-109

Posted onOctober 6, 2022October 6, 2022

In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….

Listen to the Message CCTV maintenance at DTW-109Continue

Page navigation

Previous PagePrevious 1 2 3 4 5 6 … 8 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers