Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • DTW 117 total 2 camera installation work
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu

    DTW 117 total 2 camera installation work

    Posted onOctober 6, 2022October 6, 2022

    ই পি অার বি এর কাজের জন্য যেই দুইটি সি সি ক্যামেরার পিলার সরানো হয়েছিলো ৷ সেই দুইটি সিসি ক্যামেরার তার ছিরে গিয়েছে…

    Listen to the Message DTW 117 total 2 camera installation workContinue

  • Instrumentation Findings of Month (October,2022)
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    Instrumentation Findings of Month (October,2022)

    Posted onOctober 4, 2022October 24, 2022

    Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…

    Listen to the Message Instrumentation Findings of Month (October,2022)Continue

  • DTW#201 CCTV Checking Maintenance Complete.
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW#201 CCTV Checking Maintenance Complete.

    Posted onOctober 2, 2022October 2, 2022

    Problem: Do not show footage in NAV.Problem found: POE Switch problem & 1 nos cc camera damage found and New POE Switch installing. Now problem…

    Listen to the Message DTW#201 CCTV Checking Maintenance Complete.Continue

  • DTW#105 CCTV Checking Maintenance Complete.
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW#105 CCTV Checking Maintenance Complete.

    Posted onOctober 2, 2022October 2, 2022

    Problem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…

    Listen to the Message DTW#105 CCTV Checking Maintenance Complete.Continue

  • IRP-1 sand filter “E” ultrasonic level transmitter installing.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    IRP-1 sand filter “E” ultrasonic level transmitter installing.

    Posted onSeptember 29, 2022September 29, 2022

    New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…

    Listen to the Message IRP-1 sand filter “E” ultrasonic level transmitter installing.Continue

  • IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue

    IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.

    Posted onSeptember 29, 2022October 12, 2022

    Listen to the Message IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.Continue

  • New parameter setting on an old ultrasonic level transmitter.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    New parameter setting on an old ultrasonic level transmitter.

    Posted onSeptember 28, 2022September 28, 2022

    Listen to the Message New parameter setting on an old ultrasonic level transmitter.Continue

  • DTW#106,117,118 AND 223 PTT AND UVR CHECKING COMPLETE
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW#106,117,118 AND 223 PTT AND UVR CHECKING COMPLETE

    Posted onSeptember 28, 2022September 28, 2022

    106,117,118 এবং 223 এই DTW গুলো তে আগে পাওয়ার চলে গেলে ফল্ট ধরে রাখত যার কারণে অপরেশন টিম থেকে লোক পাঠিয়ে এটা রিসেট…

    Listen to the Message DTW#106,117,118 AND 223 PTT AND UVR CHECKING COMPLETEContinue

  • IRP#1 SLUDGE DRYING BED FAULT SHOWING PROBLEM CHECKING
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    IRP#1 SLUDGE DRYING BED FAULT SHOWING PROBLEM CHECKING

    Posted onSeptember 28, 2022September 28, 2022

    ফ্লোট সুইচ কাদার সাথে আটকে যাওয়ার কারণে লো-লো কন্ডিশন দেখায়। পরে এই সমস্যা আমরা আইডেন্টিফাইড করে সমাধান করে দিয়েছি। বর্তমানে ঠিক আছে।

    Listen to the Message IRP#1 SLUDGE DRYING BED FAULT SHOWING PROBLEM CHECKINGContinue

  • IRP-1 360° DOME CAMERA DISPLAY, SPLITTER, HDMI CABLE INSPECTION & MAINTENANCE.
    ACTIVITY | CCTV | DAILY REPORTS | Jewel | Pappu | Parvez

    IRP-1 360° DOME CAMERA DISPLAY, SPLITTER, HDMI CABLE INSPECTION & MAINTENANCE.

    Posted onSeptember 27, 2022September 27, 2022

    Listen to the Message IRP-1 360° DOME CAMERA DISPLAY, SPLITTER, HDMI CABLE INSPECTION & MAINTENANCE.Continue

Page navigation

Previous PagePrevious 1 … 3 4 5 6 7 8 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers