  • DTW – 219,220 (10 nos) CC camera   optical fiber maintenance Complete .
    ACTIVITY | CCTV | DAILY REPORTS | Jewel | Pappu | Parvez

    DTW – 219,220 (10 nos) CC camera optical fiber maintenance Complete .

    Posted onSeptember 27, 2022September 27, 2022

    Listen to the Message DTW – 219,220 (10 nos) CC camera optical fiber maintenance Complete .Continue

  • ACTIVITY | CCTV | DTW | Jewel | NETWORK CONNECTIVITY | Parvez

    A new ONU install at DTW-201.

    Posted onSeptember 24, 2022September 24, 2022

    Previous ONU frequently becomes unstable/hang. So replace the ONU.

    Listen to the Message A new ONU install at DTW-201.Continue

  • ACTIVITY | DTW | Jewel | Pappu | Parvez | REPORTS

    DTW’S PRESSURE INDICATOR TRANSMITTER REPORT

    Posted onSeptember 24, 2022September 24, 2022

    SAVAR-KERANIGANJ WELL FIELD PLANT DTW,S PRESSURE INDICATOR TRANSMITTER REPORT (24.09.2022) DTW NO. VALUE STATUS DTW NO. VALUE STATUS 101 2.3  OK 201 1.9…

    Listen to the Message DTW’S PRESSURE INDICATOR TRANSMITTER REPORTContinue

  • DTW-117 & 118 UVR Related M/C checking.
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue

    DTW-117 & 118 UVR Related M/C checking.

    Posted onSeptember 22, 2022October 12, 2022

    Problem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…

    Listen to the Message DTW-117 & 118 UVR Related M/C checking.Continue

  • ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue

    OGR Booster pump E checking & maintenance.

    Posted onSeptember 22, 2022October 12, 2022

    Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…

    Listen to the Message OGR Booster pump E checking & maintenance.Continue

  • 4 nos Monitoring Well Level Sensor Installation Complete.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    4 nos Monitoring Well Level Sensor Installation Complete.

    Posted onSeptember 21, 2022September 21, 2022

    1 :MW03B 2: MW14A 3:MW08A 4: MW13B

    Listen to the Message 4 nos Monitoring Well Level Sensor Installation Complete.Continue

  • OGR booster pump D winding temperature & Bearing temperature sensor checking.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    OGR booster pump D winding temperature & Bearing temperature sensor checking.

    Posted onSeptember 18, 2022September 18, 2022

    Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….

    Listen to the Message OGR booster pump D winding temperature & Bearing temperature sensor checking.Continue

  • Chlorine cylinder lode shell checking and maintenance.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    Chlorine cylinder lode shell checking and maintenance.

    Posted onSeptember 17, 2022September 17, 2022

    Problem found: lode shell connection terminal circuit problem found.

    Listen to the Message Chlorine cylinder lode shell checking and maintenance.Continue

  • IRP1 Sludge drying bed float switch checking.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Pending Issue

    IRP1 Sludge drying bed float switch checking.

    Posted onSeptember 15, 2022October 12, 2022

    Problem found: Sludge bed চেম্বারে কাদার পরিমান বেশি হওয়ার কারনে ৷ LoLo সিগনালের ফ্লোট সুইচটি কাদার মধ্যে অাটকে যাচ্ছে ৷তাই স্কাডাতে  HiHiLoLo সিগনাল…

    Listen to the Message IRP1 Sludge drying bed float switch checking.Continue

  • IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.
    ACTIVITY | Jewel | Pappu | Parvez

    IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.

    Posted onSeptember 12, 2022September 12, 2022

    Listen to the Message IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.Continue

Page navigation

Previous PagePrevious 1 … 4 5 6 7 8 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers