DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.
ACTIVITY | DTW | MONTHLY REPORTS | Pappu

DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.

Posted onSeptember 6, 2022September 6, 2022

Listen to the Message DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE.Continue

ACTIVITY | DTW | MONTHLY REPORTS | Pappu

DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.

Posted onSeptember 5, 2022September 6, 2022

Listen to the Message DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.Continue

Instrumentation of Month (September,2022)
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

Instrumentation of Month (September,2022)

Posted onSeptember 4, 2022October 17, 2022

Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…

Listen to the Message Instrumentation of Month (September,2022)Continue

IRP-1/2 Optical Fiber Maintenance Report
ACTIVITY | CCTV | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

IRP-1/2 Optical Fiber Maintenance Report

Posted onAugust 30, 2022September 5, 2022

IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No.  Location  Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…

Listen to the Message IRP-1/2 Optical Fiber Maintenance ReportContinue

ACTIVITY | DAILY REPORTS | Pappu

DTW210 to DTW213 Optical Fiber Maintenance Work

Posted onAugust 25, 2022August 25, 2022

Listen to the Message DTW210 to DTW213 Optical Fiber Maintenance WorkContinue

Pappu | Product Specifications

Fiber Optic Cable Closure Outdoor Joint Box

Posted onAugust 7, 2022August 7, 2022

Fiber Optic Cable Closure Outdoor Joint Box Indication Description Dimension (length x width x height) 435mm x 190mm x 120mm Shock-resistance >=20N.m Type…

Listen to the Message Fiber Optic Cable Closure Outdoor Joint BoxContinue

ACTIVITY | Pappu

FIT-3001 Maintenance

Posted onJuly 5, 2022July 26, 2022

After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…

Listen to the Message FIT-3001 MaintenanceContinue

Page navigation

Previous PagePrevious 1 … 8 9 10

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers