    Optical Fiber Maintenance

    Posted onNovember 21, 2022November 22, 2022

    Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…

    Listen to the Message Optical Fiber MaintenanceContinue

  • IRP-2 ALL LOP Panel Cleaning
    ACTIVITY | DAILY REPORTS | Pappu | REPORTS

    IRP-2 ALL LOP Panel Cleaning

    Posted onNovember 20, 2022November 20, 2022

    There was so much dust

    Listen to the Message IRP-2 ALL LOP Panel CleaningContinue

  • IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

    IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change

    Posted onNovember 20, 2022November 20, 2022

    Previous control cable is damaged by ant .so we replace new control cable

    Listen to the Message IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable ChangeContinue

  • IRP-2 Server Rack Installation and Optical Fiber Rejoin
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

    IRP-2 Server Rack Installation and Optical Fiber Rejoin

    Posted onNovember 17, 2022November 17, 2022

    IRP-2 Server Rack Installation and Optical Fiber Rejoin Done

    Listen to the Message IRP-2 Server Rack Installation and Optical Fiber RejoinContinue

  • IRP-2 Server Rak Installation
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

    IRP-2 Server Rak Installation

    Posted onNovember 16, 2022November 16, 2022

    IRP-2 Sub-Station 1Nos New Server Rack Installation Done

    Listen to the Message IRP-2 Server Rak InstallationContinue

  • DTW-104,105,106,107 CLEANING WORK
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

    DTW-104,105,106,107 CLEANING WORK

    Posted onNovember 15, 2022November 15, 2022

    DTW-104,105,106,107 Cleaning Done

    Listen to the Message DTW-104,105,106,107 CLEANING WORKContinue

  • ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

    DTW-109 Radio Communication Check

    Posted onNovember 14, 2022November 14, 2022

    The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…

    Listen to the Message DTW-109 Radio Communication CheckContinue

  • ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

    DTW- 120 LIT And PIT Maintenance

    Posted onNovember 14, 2022November 14, 2022

    DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…

    Listen to the Message DTW- 120 LIT And PIT MaintenanceContinue

  • IRP-1 DTW RTU,VFD & CCTV Panel Cleaning
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

    IRP-1 DTW RTU,VFD & CCTV Panel Cleaning

    Posted onNovember 13, 2022November 15, 2022

    Dtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .

    Listen to the Message IRP-1 DTW RTU,VFD & CCTV Panel CleaningContinue

  • IRP-2 RTU & VFD Panel Cleaning
    ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

    IRP-2 RTU & VFD Panel Cleaning

    Posted onNovember 12, 2022November 12, 2022

    IRP-2 RTU Panel, Server Panel & VFD Panel Cleaning Done

    Listen to the Message IRP-2 RTU & VFD Panel CleaningContinue

Page navigation

Previous PagePrevious 1 2 3 4 … 10 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers