ACTIVITY | Jewel | Pappu | Parvez

Material inspection of SCADA Panel room Wall Mounted display.

Posted onSeptember 12, 2022September 13, 2022

Listen to the Message Material inspection of SCADA Panel room Wall Mounted display.Continue

ACTIVITY | Jewel | Pappu | Parvez

Material Inspection of IRP-1 & IRP-2 Radio communication establishment.

Posted onSeptember 12, 2022September 13, 2022

Listen to the Message Material Inspection of IRP-1 & IRP-2 Radio communication establishment.Continue

DTW-206 New POE Switch installing & CC Camera checking
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW-206 New POE Switch installing & CC Camera checking

Posted onSeptember 12, 2022September 12, 2022

Problem found: POE Switch & 4 NOS CC camera problem found.

Listen to the Message DTW-206 New POE Switch installing & CC Camera checkingContinue

ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW 106 and 223 CCTV Camera Network Establishment Equipment List

Posted onSeptember 11, 2022September 11, 2022

Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…

Listen to the Message DTW 106 and 223 CCTV Camera Network Establishment Equipment ListContinue

DTW- 206 RTU Panel Power System Checking & Problem Found.
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue

DTW- 206 RTU Panel Power System Checking & Problem Found.

Posted onSeptember 10, 2022October 12, 2022

problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.

Listen to the Message DTW- 206 RTU Panel Power System Checking & Problem Found.Continue

IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.

Posted onSeptember 10, 2022September 10, 2022

problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…

Listen to the Message IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.Continue

DTW115 SCADA PACK INSTALL COMPLETE
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW115 SCADA PACK INSTALL COMPLETE

Posted onSeptember 8, 2022September 9, 2022

Listen to the Message DTW115 SCADA PACK INSTALL COMPLETEContinue

Optical Fiber restoration work at DTW103
ACTIVITY | CCTV | DTW103 | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

Optical Fiber restoration work at DTW103

Posted onSeptember 7, 2022September 24, 2022

In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

Listen to the Message Optical Fiber restoration work at DTW103Continue

OGR Booster pump (E) checking complete.
ACTIVITY | DAILY REPORTS | Jewel | MOV | Pappu | Parvez

OGR Booster pump (E) checking complete.

Posted onSeptember 7, 2022September 7, 2022

Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E).  In this case the valve…

Listen to the Message OGR Booster pump (E) checking complete.Continue

OGR Booster Pump supply fan (4M02B) checking and findings.
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

OGR Booster Pump supply fan (4M02B) checking and findings.

Posted onSeptember 6, 2022September 6, 2022

Listen to the Message OGR Booster Pump supply fan (4M02B) checking and findings.Continue

Page navigation

Previous PagePrevious 1 … 7 8 9 10 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers