IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance
ACTIVITY | DAILY REPORTS | Pappu | Parvez

IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance

Posted onSeptember 18, 2022September 18, 2022

Problem: SCADA always showing HI signal. Problem found: 1 NOS float switch problem found. A good sensor in HIHI position is replaced with…

Listen to the Message IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor MaintenanceContinue

DTW-110 Pump inspection & ready to run up.
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez

DTW-110 Pump inspection & ready to run up.

Posted onSeptember 18, 2022September 18, 2022

Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…

Listen to the Message DTW-110 Pump inspection & ready to run up.Continue

Chlorine cylinder lode shell checking and maintenance.
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

Chlorine cylinder lode shell checking and maintenance.

Posted onSeptember 17, 2022September 17, 2022

Problem found: lode shell connection terminal circuit problem found.

Listen to the Message Chlorine cylinder lode shell checking and maintenance.Continue

IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.
ACTIVITY | Jewel | Pappu | Parvez

IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.

Posted onSeptember 12, 2022September 12, 2022

Listen to the Message IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL.Continue

ACTIVITY | Jewel | Pappu | Parvez

Material inspection of SCADA Panel room Wall Mounted display.

Posted onSeptember 12, 2022September 13, 2022

Listen to the Message Material inspection of SCADA Panel room Wall Mounted display.Continue

ACTIVITY | Jewel | Pappu | Parvez

Material Inspection of IRP-1 & IRP-2 Radio communication establishment.

Posted onSeptember 12, 2022September 13, 2022

Listen to the Message Material Inspection of IRP-1 & IRP-2 Radio communication establishment.Continue

DTW-206 New POE Switch installing & CC Camera checking
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW-206 New POE Switch installing & CC Camera checking

Posted onSeptember 12, 2022September 12, 2022

Problem found: POE Switch & 4 NOS CC camera problem found.

Listen to the Message DTW-206 New POE Switch installing & CC Camera checkingContinue

ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW 106 and 223 CCTV Camera Network Establishment Equipment List

Posted onSeptember 11, 2022September 11, 2022

Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…

Listen to the Message DTW 106 and 223 CCTV Camera Network Establishment Equipment ListContinue

DTW- 206 RTU Panel Power System Checking & Problem Found.
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue

DTW- 206 RTU Panel Power System Checking & Problem Found.

Posted onSeptember 10, 2022October 12, 2022

problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.

Listen to the Message DTW- 206 RTU Panel Power System Checking & Problem Found.Continue

IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.

Posted onSeptember 10, 2022September 10, 2022

problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…

Listen to the Message IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found.Continue

Page navigation

Previous PagePrevious 1 … 8 9 10 11 12 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers