DTW115 SCADA PACK INSTALL COMPLETE
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW115 SCADA PACK INSTALL COMPLETE

Posted onSeptember 8, 2022September 9, 2022

Listen to the Message DTW115 SCADA PACK INSTALL COMPLETEContinue

Optical Fiber restoration work at DTW103
ACTIVITY | CCTV | DTW103 | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

Optical Fiber restoration work at DTW103

Posted onSeptember 7, 2022September 24, 2022

In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…

Listen to the Message Optical Fiber restoration work at DTW103Continue

OGR Booster pump (E) checking complete.
ACTIVITY | DAILY REPORTS | Jewel | MOV | Pappu | Parvez

OGR Booster pump (E) checking complete.

Posted onSeptember 7, 2022September 7, 2022

Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E).  In this case the valve…

Listen to the Message OGR Booster pump (E) checking complete.Continue

OGR Booster Pump supply fan (4M02B) checking and findings.
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

OGR Booster Pump supply fan (4M02B) checking and findings.

Posted onSeptember 6, 2022September 6, 2022

Listen to the Message OGR Booster Pump supply fan (4M02B) checking and findings.Continue

Instrumentation of Month (September,2022)
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

Instrumentation of Month (September,2022)

Posted onSeptember 4, 2022October 17, 2022

Daily Work Plan September 2022đź — SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: âś…PAPPU,…

Listen to the Message Instrumentation of Month (September,2022)Continue

IRP-1/2 Optical Fiber Maintenance Report
ACTIVITY | CCTV | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

IRP-1/2 Optical Fiber Maintenance Report

Posted onAugust 30, 2022September 5, 2022

IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No.  Location  Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…

Listen to the Message IRP-1/2 Optical Fiber Maintenance ReportContinue

ACTIVITY | DTW | Parvez

Level Sensor Report 2022

Posted onAugust 30, 2022November 14, 2022

Level Sensor Report October 2022 SL NO. DTW NO. STATIC LEVEL PUMPING LEVEL Type STATUS 01 101   5.8 ❎Level Sensor problem. 02…

Listen to the Message Level Sensor Report 2022Continue

VCB Installation & Commissioning
ACTIVITY | Parvez | Technical Papers

VCB Installation & Commissioning

Posted onJuly 31, 2022August 24, 2022

Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…

Listen to the Message VCB Installation & CommissioningContinue

DTW-118,122,220 & 205 automatic start-stop problem solved
ACTIVITY | Parvez | REPORTS

DTW-118,122,220 & 205 automatic start-stop problem solved

Posted onJuly 30, 2022August 1, 2022

Due to solving those problems : Modbus ground connection check. VFD frequency regulator loose connection check. SPD check . RJ-45 connector check. Cable…

Listen to the Message DTW-118,122,220 & 205 automatic start-stop problem solvedContinue

IRP-1 & 2 all DTW CCTV UPS maintenance, replace & install
MONTHLY REPORTS | Parvez

IRP-1 & 2 all DTW CCTV UPS maintenance, replace & install

Posted onJuly 27, 2022August 14, 2022

Savar-Keraniganj Well Field Plant IRP-1 & 2 all DTW’s  CCTV UPS maintenance , replace & install SL No. DTW No. Problem Activity Comment…

Listen to the Message IRP-1 & 2 all DTW CCTV UPS maintenance, replace & installContinue

Page navigation

Previous PagePrevious 1 … 9 10 11 12 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers