IRP-2 Server Rack Installation and Optical Fiber Rejoin
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
IRP-1. CC Camera Server Panel Cleaning Done
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
DTW-104,105,106,107 Cleaning Done
In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…
There was a damaged LIT. After regeneration work we have install a new LIT
Dtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .
Modbus Serial communication cable check Complete. No problem Found in the Field LIT Do Not Down in The Boring After 10 Meter
DTW-205 1Nos New PIT Installation Done DTW-211 1Nos New PIT Installation Done DTW-104 1Nos Old PIT Installation Done
Dtw-208 CCTV power supply is received from directly LV panel. Frequently Fault come in UPS. Now Everything is Normal.