PIT Maintenance Work Report (IRP-1)
ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

PIT Maintenance Work Report (IRP-1)

Posted onNovember 9, 2022November 9, 2022

DTW-114 PIT ok. DTW-113 PIT ok but scadapack AO port damaged. DTW-104 PIT doesn’t exist. DTW-105 PIT ok (regeneration on going)

Listen to the Message PIT Maintenance Work Report (IRP-1)Continue

DTW-107 Radio Communication Check and Maintenance
ACTIVITY | DAILY REPORTS | DTW | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez

DTW-107 Radio Communication Check and Maintenance

Posted onNovember 8, 2022November 8, 2022

Radio Communication problem solve and there are graphical problem in SCADA DTW 107 radio comm. checking complete.গত ৩১/১০/২০২২ তারিখ বিকাল 06:18 pm এর…

Listen to the Message DTW-107 Radio Communication Check and MaintenanceContinue

PIT maintenance work report (IRP-2)
ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

PIT maintenance work report (IRP-2)

Posted onNovember 8, 2022November 8, 2022

PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist

Listen to the Message PIT maintenance work report (IRP-2)Continue

DTW-211 Serial Communication Cable check and Rejoin
ACTIVITY | DTW | Parvez

DTW-211 Serial Communication Cable check and Rejoin

Posted onNovember 5, 2022November 5, 2022

DTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal

Listen to the Message DTW-211 Serial Communication Cable check and RejoinContinue

DTW-217 and 103 VFD controller Drive Installation Done
ACTIVITY | DTW | Parvez

DTW-217 and 103 VFD controller Drive Installation Done

Posted onNovember 5, 2022November 5, 2022

1.VFD Controller Installation 2.Modbus Serial Communication Cable Check

Listen to the Message DTW-217 and 103 VFD controller Drive Installation DoneContinue

DTW-103 VFD Controller Install
ACTIVITY | DTW | DTW103 | Parvez

DTW-103 VFD Controller Install

Posted onNovember 3, 2022November 3, 2022

1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done

Listen to the Message DTW-103 VFD Controller InstallContinue

DTW | MONTHLY REPORTS | Parvez | REPORTS

LIT & PIT report October-2022

Posted onOctober 29, 2022October 29, 2022

DTW NO. LIT PIT Comments DTW NO. LIT PIT Comments 101 NOT OK OK 201 OK OK 102 OK OK 202 NOT OK…

Listen to the Message LIT & PIT report October-2022Continue

EPRV work with DTW 103 by ICE Team & SEL
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

EPRV work with DTW 103 by ICE Team & SEL

Posted onOctober 22, 2022October 22, 2022

Listen to the Message EPRV work with DTW 103 by ICE Team & SELContinue

DTW- 101,102,103,104,106,107,109,110  I & C Device checking work complete.
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

DTW- 101,102,103,104,106,107,109,110 I & C Device checking work complete.

Posted onOctober 17, 2022October 17, 2022

Listen to the Message DTW- 101,102,103,104,106,107,109,110 I & C Device checking work complete.Continue

IRP-2 3V07A MOV Reset, reprogramming and configuration work complete.
ACTIVITY | DAILY REPORTS | MOV | Pappu | Parvez

IRP-2 3V07A MOV Reset, reprogramming and configuration work complete.

Posted onOctober 6, 2022October 6, 2022

Problem: This MOV is abnormal working. MOV Open time & close time 0% to 100% value not showing. IRP-2 3V07A MOV Reset, reprogramming…

Listen to the Message IRP-2 3V07A MOV Reset, reprogramming and configuration work complete.Continue

Page navigation

Previous PagePrevious 1 … 4 5 6 7 8 … 12 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers