CCTV camera maintenance & optical fiber rearrangement at DTW-117

Posted onOctober 6, 2022October 6, 2022

In DTW-117, there are 2 Nos maintenance and installation : 1. Optical fiber rearrangement. 2. 2 Nos new camera install. 3. 44 meter…

Listen to the Message CCTV camera maintenance & optical fiber rearrangement at DTW-117Continue

CCTV maintenance at DTW-103
ACTIVITY | CCTV | DTW | Jewel | Parvez

CCTV maintenance at DTW-103

Posted onOctober 6, 2022October 6, 2022

In DTW-103, there are 3 Nos maintenance and installation : 1. IP configure in CCTV camera. 2. 2 Nos new camera install. 3….

Listen to the Message CCTV maintenance at DTW-103Continue

CCTV maintenance at DTW-109
ACTIVITY | CCTV | DTW | Jewel | Parvez | Uncategorized

CCTV maintenance at DTW-109

Posted onOctober 6, 2022October 6, 2022

In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….

Listen to the Message CCTV maintenance at DTW-109Continue

A new PoE switch install at DTW-201
ACTIVITY | CCTV | DTW | Pappu | Parvez

A new PoE switch install at DTW-201

Posted onOctober 6, 2022October 6, 2022

Previous PoE switch has port problem.

Listen to the Message A new PoE switch install at DTW-201Continue

Instrumentation Findings of Month (October,2022)
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

Instrumentation Findings of Month (October,2022)

Posted onOctober 4, 2022October 24, 2022

Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…

Listen to the Message Instrumentation Findings of Month (October,2022)Continue

DTW#201 CCTV Checking Maintenance Complete.
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW#201 CCTV Checking Maintenance Complete.

Posted onOctober 2, 2022October 2, 2022

Problem: Do not show footage in NAV.Problem found: POE Switch problem & 1 nos cc camera damage found and New POE Switch installing. Now problem…

Listen to the Message DTW#201 CCTV Checking Maintenance Complete.Continue

DTW#105 CCTV Checking Maintenance Complete.
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

DTW#105 CCTV Checking Maintenance Complete.

Posted onOctober 2, 2022October 2, 2022

Problem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…

Listen to the Message DTW#105 CCTV Checking Maintenance Complete.Continue

IRP-1 sand filter “E” ultrasonic level transmitter installing.
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

IRP-1 sand filter “E” ultrasonic level transmitter installing.

Posted onSeptember 29, 2022September 29, 2022

New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…

Listen to the Message IRP-1 sand filter “E” ultrasonic level transmitter installing.Continue

IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue

IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.

Posted onSeptember 29, 2022October 12, 2022

Listen to the Message IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.Continue

New parameter setting on an old ultrasonic level transmitter.
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

New parameter setting on an old ultrasonic level transmitter.

Posted onSeptember 28, 2022September 28, 2022

Listen to the Message New parameter setting on an old ultrasonic level transmitter.Continue

Page navigation

Previous PagePrevious 1 … 5 6 7 8 9 … 12 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers