    CCTV camera maintenance & optical fiber rearrangement at DTW-117

    Posted onOctober 6, 2022October 6, 2022

    In DTW-117, there are 2 Nos maintenance and installation : 1. Optical fiber rearrangement. 2. 2 Nos new camera install. 3. 44 meter…

    Listen to the Message CCTV camera maintenance & optical fiber rearrangement at DTW-117Continue

  • CCTV maintenance at DTW-103
    ACTIVITY | CCTV | DTW | Jewel | Parvez

    CCTV maintenance at DTW-103

    Posted onOctober 6, 2022October 6, 2022

    In DTW-103, there are 3 Nos maintenance and installation : 1. IP configure in CCTV camera. 2. 2 Nos new camera install. 3….

    Listen to the Message CCTV maintenance at DTW-103Continue

  • CCTV maintenance at DTW-109
    ACTIVITY | CCTV | DTW | Jewel | Parvez | Uncategorized

    CCTV maintenance at DTW-109

    Posted onOctober 6, 2022October 6, 2022

    In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….

    Listen to the Message CCTV maintenance at DTW-109Continue

  • A new PoE switch install at DTW-201
    ACTIVITY | CCTV | DTW | Pappu | Parvez

    A new PoE switch install at DTW-201

    Posted onOctober 6, 2022October 6, 2022

    Previous PoE switch has port problem.

    Listen to the Message A new PoE switch install at DTW-201Continue

  • Instrumentation Findings of Month (October,2022)
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    Instrumentation Findings of Month (October,2022)

    Posted onOctober 4, 2022October 24, 2022

    Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…

    Listen to the Message Instrumentation Findings of Month (October,2022)Continue

  • DTW#201 CCTV Checking Maintenance Complete.
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW#201 CCTV Checking Maintenance Complete.

    Posted onOctober 2, 2022October 2, 2022

    Problem: Do not show footage in NAV.Problem found: POE Switch problem & 1 nos cc camera damage found and New POE Switch installing. Now problem…

    Listen to the Message DTW#201 CCTV Checking Maintenance Complete.Continue

  • DTW#105 CCTV Checking Maintenance Complete.
    ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Pappu | Parvez

    DTW#105 CCTV Checking Maintenance Complete.

    Posted onOctober 2, 2022October 2, 2022

    Problem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…

    Listen to the Message DTW#105 CCTV Checking Maintenance Complete.Continue

  • IRP-1 sand filter “E” ultrasonic level transmitter installing.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    IRP-1 sand filter “E” ultrasonic level transmitter installing.

    Posted onSeptember 29, 2022September 29, 2022

    New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…

    Listen to the Message IRP-1 sand filter “E” ultrasonic level transmitter installing.Continue

  • IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue

    IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.

    Posted onSeptember 29, 2022October 12, 2022

    Listen to the Message IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete.Continue

  • New parameter setting on an old ultrasonic level transmitter.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    New parameter setting on an old ultrasonic level transmitter.

    Posted onSeptember 28, 2022September 28, 2022

    Listen to the Message New parameter setting on an old ultrasonic level transmitter.Continue

Page navigation

Previous PagePrevious 1 … 5 6 7 8 9 … 12 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers