1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup



1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup



when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…
DTW-106 CCTV Base Placement Done
DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING COMPLETE There was so much dust
1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done