1.Cable connector change 2. IP Setup


1.Cable connector change 2. IP Setup


Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…