1.1 Nos New Camera Installation . 2. connector change 3. IP Setup



1.1 Nos New Camera Installation . 2. connector change 3. IP Setup



Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
Due To Strom the optical fiber cable fall down and damage near DTW-121 to 122 now everything is normal
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
Findings: SFP problem found in 1 Nos S-Ring switch. As a result, 172.16.100.110,111,113,115 I/P assigned camera’s view isn’t shown in SCADA monitor. Action…
IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…