1.Cable connector change 2. IP Setup



1.Cable connector change 2. IP Setup



2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup
Dtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .
when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…